- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2006年3月级口译答案及解析
of support and hanger. Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance. When cables pass through the firewall, of lax structure of local fire safety clamps. Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break. Tinned copper nose clean solder full exterior surface is smooth without burrs. Control cable Assembly should be fastened, dense, solid, clean, and beautiful. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order. Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant. 5 thermal process control measures for quality problems 5.1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems. Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector. Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong. Requirements for welding personnel certified, and welding before welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every
您可能关注的文档
最近下载
- 2025年泡沫铝行业研究报告及未来发展趋势预测.docx
- 智慧城市应急管理信息化平台建设方案(47页).pptx VIP
- 班主任基本功大赛育人故事一等奖:从“心”擦亮星星的光.docx VIP
- (高清版)-B-T 41932-2022 塑料 断裂韧性(GIC和KIC)的测定 线弹性断裂力学(LEFM)法.pdf VIP
- 上海牛津英语5B知识点汇总.docx VIP
- 华为交换机配置教程(从入门开始)-华为交换机详细教程.pdf VIP
- 机械创新设计第七章 仿生原理与创新设计 .ppt VIP
- 高等教育心理学课件.ppt VIP
- ISO 55013-2024 资产管理-数据资产管理指南(中文版-雷泽佳翻译-2024).docx
- 发改价格〔〕670建设工程监理与相关服务收费标准.doc VIP
文档评论(0)