【下载】201年3月计算机等级考试二级VB真题打包下载.docVIP

  • 4
  • 0
  • 约6.1千字
  • 约 11页
  • 2017-03-08 发布于贵州
  • 举报

【下载】201年3月计算机等级考试二级VB真题打包下载.doc

【下载】201年3月计算机等级考试二级VB真题打包下载

声明: 考试吧(E) 收集整理,转载请注明出自 服务:面向较高学历人群,提供计算机类,外语类,学历类,资格类,会计类,工程类,医学类等七大类考试的全套考试信息服务及考前培训. 1~5ADABD   6~10 DADBD  1C   11~15BCDDC   16~20 DABAC   21~25BDCAB   26~30BCCDD 31~35BABBC -5 BDADA   6-10 DADAB   11-15 BCDAC   16-20 AABAA   21-25 BCCAB   26-30 BCCDD   31-35 DADC 考试吧 E -第一个极力推崇人性化服务的专业考试培训网站每日更新!!! be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal con

文档评论(0)

1亿VIP精品文档

相关文档