Systems Engineering Design Synthesis and Verification Activities.pptVIP

Systems Engineering Design Synthesis and Verification Activities.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Systems Engineering Design Synthesis and Verification Activities

The Work Breakdown Structure is a Product of the Systems Engineering Process The program work breakdown structure (WBS) establishes the essential framework for program and technical planning, cost estimating, resource allocations, performance measurements, and status reporting. The WBS shall define the total system to be developed or produced, display the total system as a product-oriented family tree composed of hardware, software, services, and data, and relate the elements of work to each other and to the end product. WBS Definitions Program WBS - A program WBS shall be developed to define initially the top three levels of a WBS for the entire acquisition cycle of the system being acquired. A final program WBS shall be prepared by compiling the elements of the contract WBSs with the initial program WBS. Contract WBS - From the initial program WBS, preliminary contract WBSs for individual contracts shall be developed to be negotiated with the contractors involved. The contract WBS shall be extended to lower levels by the contractor using as guidance MIL-HDBK-881. Specifications shall Conform to the WBS 1. WBS elements may contain both nonrecurring and recurring effort. 2. Integrated logistics support and software shall be accommodated in the appropriate levels of the WBS in accordance with MIL-HDBK-881. 3. Functional cost elements such as engineering, tooling, quality control, and manufacturing are not WBS elements and shall not be represented as such in the WBS. Example System Configuration EXERCISE #1 AJS Statement of Customer Requirements AJS Statement of Customer Requirements (Cont.) See MIL-HDBK-881 Cost, Schedule, and Performance Risk Management The program manager shall establish a risk management program for each acquisition program to identify and control performance, cost, and schedule risks. The risk management program shall identify and track risk drivers, define risk abatement plans, and provide for continuous risk assessment throughout

文档评论(0)

liudao + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档