- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
浅议建设工程投报价策略与技巧
and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... Tube wall thickness (mm) 2-3 4-6 7-10 weld form no slope mouth weld strengthening height h (mm) 1-1.5 1.5-2 weld width b (mm) 5-6 7-6 has slope mouth weld strengthening height h (mm) 1.5-2 2 weld width b (mm) cover had each edge slope mouth about 2 mm argon arc welding weld strengthening surface height and width tube wall thickness (mm) 2--3 3--4 5--6 weld form weld strengthening height h (mm) 1-1 .5 1.5-2 2-2.5 width b (mm)
and performan
您可能关注的文档
- 浅析建筑工地的全管理措施.doc
- 浅析建筑工程创施工技术.doc
- 浅析建筑工程施技术管理.doc
- 浅析建筑施工企如何做好节能减排工作.doc
- 浅析建筑施工技中节能理念的应用.doc
- 浅析异化劳动理中的共产主义思想.doc
- 浅析当好班长应备的能力和素质.doc
- 浅析影视特效在视艺术中的作用.doc
- 浅析快乐体育思在学校体育中的应用 王奎.doc
- 浅析我国企业会信息的失真问题.doc
- DB45_T 2616-2022 救助管理机构受助人员站内救助服务规范.docx
- DB5201_T 119-2022 公交线路优化技术导则.docx
- DB5101T 80-2020 地理标志产品 唐元韭黄.docx
- 养老机构护理服务规范 __DB54_T 0197-2020.docx
- DB43_T 2157-2021 非洲猪瘟疫情场复养清洗消毒技术规程.docx
- DB37/T 1200-2009 汽车用压缩天然气自动充装系统通用技术条件.docx
- 巴中市农户散养鸡圈舍建设规范 __DB5119_T 22-2021.docx
- DB54_T 0373-2024 景观竹林营建技术规程.docx
- DB63_T 2184-2023 气象灾害年景评估技术方法.docx
- DB5133T69-2022 高寒退化草地生态修复技术规范.docx
文档评论(0)