- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
“丝绸之路经济”与中国对外开放战略(下)78分答案
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment;
您可能关注的文档
- SD-Y310液压牙轮钻机.doc
- SCI收录的中期刊一览表.doc
- SAP BW 户与权限管理文档.doc
- SecureDC-R 文档权限管理系统.doc
- Simulin常用库模块介绍(Matlab2013a).docx
- SF-03四方司网络使用手册.docx
- Skopos_heory与商标英译策略.doc
- Skype 协分析(2006版).doc
- Skype安装用说明手册.doc
- SMT不良现象因分析图--鱼骨图.doc
- 2025-2030 中国氯化苄行业销售状况及竞争格局研究报告.docx
- 2025-2030 中国甲乙酮(mek)行业发展形势与投资策略研究报告.docx
- 2025年福建省漳州市中考一模生物试题(含答案).pdf
- 赋能创业:社交媒体营销-掌握社交媒体,轻松应对市场挑战.pptx
- 爱普生Stylus Photo PX710W系列基本操作手册.pdf
- 2025-2030 中国前碰撞预警系统市场运营格局及前景战略分析研究报告.docx
- 小学科学四年级下册教学计划.pdf
- 两栖类与爬行类的特征(新教材课件)七年级生物下册(2024).pptx
- 2025-2030 中枢神经系统药物市场需求趋势及发展机遇可行性研究报告.docx
- 演出经纪人考试技巧与试题及答案汇编.docx
文档评论(0)