- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
0n-yevc会计从业资格-财经法规重点
、
.~
我们‖打〈败〉了敌人。 ②我们‖〔把敌人〕打〈败〉了。
shall not exceed the level of stator core, or arc skateboards, protection of stator plate rollover may occur), reasonable to generally should be centralized. Avoid layout vulnerable to mechanical damage, damp, vulnerable to corrosion and vibration, ensure as far as possible with the platform stairs, lifting devices, cover plates, electrical enclosures and other intervals at arms length. Piping support and hanger set weight of the weight and its insulation shall meet reasonable piping displacement, increase system stability, prevention of pipeline vibration displacement in operation. Process piping support and hanger spacing are shown in table 1. Process piping in the drain pipe must have a certain slope (about 0.002-0.004) to drain. Enter the pipe should be smooth flow to the lateral, intake manifold into the expansion tank should be considered order, low pressure or high pressure drop near the expansion tank inlet. Pipe deflection and expansion must be considered the absorption problem, consider the natural direction of the pipeline using the small pipe to achieve thermal expansion compensation and, if necessary, consider
shall not exceed the level of stator core, or arc skateboards, protection of stator plate rollover may occur), reasonable to generally should be centralized. Avoid layout vulnerable to mechanical damage, damp, vulnerable to corrosion and vibration, ensure as far as possible with the platform stairs, lifting devices, cover plates, electrical enclosures and other intervals at arms length. Piping support and hanger set weight of the weight and its insulation shall meet reasonable piping displacement, increase system stability, prevention of pipeline vibration displacement in operation. Process piping support and hanger spacing are shown in table 1. Process piping in the drain pipe must have a certain slope (about 0.002-0.004) to drain. Enter the pipe should be smooth flow to the lateral, intake ma
您可能关注的文档
- 0015浙江舟:全面推行“网格化管理、.doc
- 001_899法学综合课7.doc.doc
- 002014年册会计师教材变化对比——会计篇.doc
- 00160审计模拟试题.doc
- 003安全施工织设计.doc
- 0084 以《院处方点评管理规范(试行)》为指导审核门急诊处方的.doc
- 00AAU200年陕西省会计从业资格考试试题及答案(三门全).doc
- 01-C2-03砼浇筑技术交底.doc
- 00年会计综合南开考研真题含答案.doc
- 01-用友软件作流程-建立新账套.doc
- 0Nvhxpq010高明电大财务管理形成性考核册答案.doc
- 0Oeeisw010会计从业资格考试模拟试题---《会计基础》.doc
- 0o-ckvb会计从业资格考试《会计基础》.doc
- 0p-hlmc会计从业资格真题.doc
- 0Oxfiog010年《初级会计电算化》精选预测试题.doc
- 0Qlhck210年会计从业考试《会计基础》模拟试卷四及答案.doc
- 0Qmzmg210年会计从业资格考试《会计基础》学习讲义7章.doc
- 0Qmsby210年会计从业资格考试《财经法规》考前预测试题选择题100道.doc
- 0Smlchu010年广东初级会计电算化考试复习测试题一.doc
- 0Titlbm010年会计电算化题库.doc
文档评论(0)