室外大口径PE管道施工工艺探析.docVIP

  • 5
  • 0
  • 约1.49千字
  • 约 5页
  • 2016-11-08 发布于重庆
  • 举报
室外大口径PE管道施工工艺探析

室外大口径PE管道施工大口径PE管施工On the outside of large diameter PE pipe construction technology Abstract :along with the development of science and technology and the enhancement of environmental protection consciousness, the green environmental protection building materials gradually respected around the world. At present, Chinas pipeline laying the building materials are green building materials of PE pipe, which has no harmful elements. PE pipe is not only good toughness, good welding performance, reliable connection, low cost, and air tightness, corrosion resistance. According to the construction of outdoor large-diameter PE pipe, this technology combined with the construction practice of Hun n an New District in Shenyang, Hun n an avenue of longitudinal drainage ditch, carries on the simple introduction to the outdoor PE large diameter pipeline construction process, construction points, provide the reference for the similar engineering construction. keyword :large-diameter PE pipe; pipeline construction; construction technology 1 PE管和度应符合设计要求 图1 大口径管道铺设 1.1.5管道焊接 大口径PE管的焊接,本工程主要采用采用对接热熔连接   图2—管道热熔焊接 图3—管道热熔焊接 a.对接热熔焊施工工艺 (1) 清理管端 (2) 采用修整机具对两个焊接接头进行修整,并将管子夹紧在熔焊设备上(3) 取下修整机具将管道的两端对齐,调整保证管道的两端在一个平面上,保证管线的中心在一条线上。 (4) 在两端插入加热板,,将管端压紧在加热板上,在两管端周围形成一致的熔化 。对接热熔焊在两端插入加热板,,将管端压紧在加热板上,在两管端周围形成一致的熔化束,立刻移走加热板,避免管子熔化端加热板摩擦,形成一个双翻边的熔化束(两侧翻边、内外翻边的环状凸起) 熔焊接头冷却至少30 min。对接热熔焊施工 施工前准备工作 铺设工作 槽底准备工作 管槽开挖 回填 管道试压 管道清理 管道焊接

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档