本科毕业设计(论文) 题目:冲垭口隧道初步设计 院(系): 建筑工程学院 专 业: 土木工程 班 级: 090712 学 生: 学 号: 090712321 指导教师: 王 亮 2013年 月 Preliminary Design of Chong Ya Kou Tunnel Abstract In order to complete the knowledge which study in the college. At the same time, rapidly extended transport development and human production and life of constant demand, the world built by the mileage of the traffic tunnel, the tunnel construction has become a very important element of social development and human life. To conduct a comprehensive, systematic training for tunnel construction design including job content, work procedures, design of tunnel construction in tunnel engineering design and construction work to lay a good foundation for future. Chong Ya Kou road tunnel in Gui Zhou province, belong to Hang Rui highway Gui Zhou line from Bi Jie to Du Ge. Tunnel length 1410m. Design of the main content include: the tunnel route plan formulation selection, the design of the cross section, the design of the portal, the design of the lining structure, the design of waterproof and drainage, and the tunnel two lining structure calculation, and the design and calculation of tunnel ventilation and lighting. The final outcome of the design include: the design specification, tunnel lining, tunnel ventilation calculation, the calculation of tunnel lighting, route plan, profile design, the design of cross-sectional, architectural boundaries and the lining of the inside contour, the design of entrance and portal, ventilation layout, lighting arrangement. Key Words: Tunnel, Structural calculation, Lining, Waterproof and drainage, Ventilated, lighting 主 要 符 号 表 弹性抗力系数 围岩容重 二次衬砌厚度 衬砌矢高 偏心距

文档评论(0)

1亿VIP精品文档

相关文档