- 1、本文档共133页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
塔柱式地铁车站主线隧道及横通道爆破设计
山 东 科 技 大 学
本科毕业设计(论文)
学院名称
专业班级
学生姓名 A
学 号 指 导 教 师
摘 要
地铁作为一种新兴城市交通手段,具有高效、节能、环保、运量大、速度快等优点,因而逐渐受到人们的重视。但是由于地铁建设涉及到地下地质层,地质层情况复杂多变,这极大程度上影响了地铁的施工。Abstract
The subway as a new means of city transportation has the advantages of high efficiency, energy saving, environmental protection, large volume, speeds, and has gradually been peoples attention. But due to subway construction relates to underground geological strata, geologic layer and complex situation; it has great influence on the subway construction. Especially in the construction process of the selection of blasting scheme, construction safety, construction quality control and vibration control are the subway construction the difficulty, therefore, this paper in view of the Qingdao Dunhua Road subway pylon type metro station, hope that through reasonable design of blasting scheme, reduce over break and under break, controlled blasting on the surrounding rock disturbance, in order to achieve security complete station construction, ensure the quality of construction.
In this project is mainly to solve the problem of Qingdao Dunhua Road subway station the main line of the tunnel and admit blasting design, the first tower type metro station design method, chamber is more, construction is complex, on the surrounding rock pillar protection, tunnel cross section form, tunnel lining structure, construction method, initial supporting structure model, parameter and so on are new and higher requirements. Therefore in the blasting design process, we used a bench excavation, large diameter hollow hole, excavation, piecewise detonating method, at the same time, a detonation subsection delay blasting excavation patent technology, at the same time, a detonation subsection delay blasting excavation patent technology, the spirit of multiple drilling, charging less, short footage principle, strictly control the footage, single hole charge, in the design of the A cross passage, was
您可能关注的文档
- 土石方挡墙施工组织设计.doc
- 土石方施工组织设计.doc
- 土石方挖填.doc
- 土石方爆破设计方案11.doc
- 土豆健康醋厂可行性研究报告.doc
- 土豆粉工厂设计.doc
- 土耳其I电站项目_盘箱柜招标文件-技术部分(FINAL).doc
- 土豆深加工项目可行性研究报告.doc
- 土石方开挖施工组织设计.doc
- 土豆粉店面运营手册.doc
- 重庆新速达物业服务集团股份凯里公司招聘笔试题库2024.pdf
- 浙江杭州千岛湖泰众肉类食品有限公司招聘笔试题库2024.pdf
- 陕西新华出版传媒集团新华书店分公司招聘笔试题库2024.pdf
- 宁夏海原县肉牛产业发展集团有限公司招聘笔试题库2024.pdf
- 浙江温岭市化工轻工建筑材料有限公司招聘笔试题库2024.pdf
- 中航飞机汉中航空零组件制造有限公司招聘笔试题库2024.pdf
- 山东海阳市海昇矿产资源开发有限公司招聘笔试题库2024.pdf
- 山东潍坊寿光市公共交通运输有限公司招聘笔试题库2024.pdf
- 内蒙古察右前旗农业投资开发有限公司招聘笔试题库2024.pdf
- 线上清明祭英烈活动策划.pptx
文档评论(0)