- 27
- 0
- 约5.55千字
- 约 28页
- 2016-11-23 发布于湖北
- 举报
* Some operators are utilizing Acid Soluble Cement (ASC) to cement their horizontal casing. The ASC dissolves in the presence of HCl acid creating an excellent flow path from the perforation to the sandface. The toe of the horizontal is opened with a select fire TCP gun in 2-4 perforation clusters spaced 75-150 ft. apart and then are fractured together. These clusters are referred to as a “span”. Each span represents a frac stage and these spans are spaced out between 300-500 ft. and each span is isolated between by a pump down FasDrill (composite) Bridge or Frac Plug. As many as 4-12 s
您可能关注的文档
最近下载
- 2023《伊力特酒业公司企业营运能力现状、问题及完善对策》11000字.docx VIP
- 2026年学校资产管理培训试题及答案.docx VIP
- 五年级奥数《行程问题(四)》练习题.docx VIP
- 2024《今世缘酒业公司企业营运能力现状、问题及完善对策》11000字.docx VIP
- 山东省淄博市周村区(五四制)2026年六年级下学期期中考试数学试题(含简单答案).docx VIP
- 河北省沧州市泊头市2025届九年级上学期期中教学质量检测数学试卷(含答案).docx VIP
- 2025-2030年中国室内游乐园行业市场发展现状及发展趋势与投资研究报告.docx VIP
- 5000t污水处理厂设计方案A2O+MBR工艺(完整).pdf VIP
- 零碳学校建设指南.pdf VIP
- 监测监控基本知识培训课件.pptx VIP
原创力文档

文档评论(0)