flow and trbulent flow.doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
flow and trbulent flow

flow and turbulent flow, vortex flow and laminar flow state and the sundry buoyancy effect on water, forcing tube residual material suspended in the fluid motion, mobile, rolling, so that the remaining material inside as outside fluid movement out of the tube. 2. Closed circuit flushing technology application. Application effect is good, the applicable scope is wide, the economic benefit is remarkable, energy conservation and environmental protection. Save water, save time, save electricity, environmental protection, suitable for urban heating network, water supply, pipe network, suitable for all kinds of water for industrial and civil pipeline flushing of the circulation medium in the. 1 h413034 long-distance pipeline construction procedures Long-distance pipeline is refers to the long distance transportation between the origin, repository, user of oil and gas pipeline. The preparing work before a, long-distance pipeline construction 1. Technical preparation. To design, the blue prints.the design disclosure and technical clarificaiton work. Construction organization design, construction scheme and quality, environmental, health, and safety measures of editorial work. 2. Human resources. Establishing the project organization. Configuration can meet the needs of engineering construction personnel. Main kinds of personnel training, organization forensic examination. 3. The machines. Complete the construction machines and equipment configuration. Complete construction machines and equipment maintenance. Dedicated to complete specific project construction machinery production. 4. Materials preparation. Construction of main materials store should be able to meet the requirements of continuous operation. To do a good job of material purchasing, validation, transport, storage. 5. The site preparation. The construction of the relevant formalities. Land for construction shall meet the requirements. Field water, roads, electricity, telecommunications, grading and se

文档评论(0)

bguarfan + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档