- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
关于工程建设项目风险理研究
安徽建筑大学
毕业设计(论文)
英文翻译
题 目 关于工程建设项目风险管理研究
姓 名
班 级 房地产(1)班
学 号 10204070119
指导教师
二○一四年 五 月
Project Risk Management
Risk management is frequently associated with the construction of the building along with project engineering process. Yet,one of the critical aspects of project planning and management is risk management.One way of defining “risk” is that risk is a problem that has not happened yet.While this may be a bit simplistic, it does get to the core of the issue a project manager faces: “What are the problems which might be encountered while performing this project and how to avoid them?”Given the critical nature of this question, risk management would be high on every project manager’s agenda. Unfortunately, risk management is often not given the attention it warrants. This does not necessarily mean that the project manager does not consider the issues related to risk, but rather that often project managers only perform a superficial examination of the issues related to risk and then add a “margin for risk.”
Nonetheless, project managers often resort to these techniques because the risks in projects are outside of their immediate control. Therefore, because a project manager may feel somewhat helpless in dealing with the risk, they approach the issue with a guess figuring it is better than doing nothing at all. This is misguided because all risks can be effectively addressed in one of several ways. Risk can be reduced or eliminated by including problem remediation activities into the project plan; transferred to other activities or other responsible parties, absorbed or pooled by simply planning for them; avoided by putting quality control practices and procedures into place.
Some of these techniques are more easily performed and less costly overall than others.For example, it is easie