- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Doubl Surface dressing 双表处施工英文版
UPGRADING PERAMIHO JCT TO MBINGA ROAD TO BITUMEN STANDARD
Method Statement for Double Surface Dressing
Personnel:
Team leader 1 (Wang Shizheng)
Mr. Zhang will be responsible for the works and all instruction issued on site could be directed to him. He has a good command of English. He is able to brief in detail on this method statement before the works commence.
1. Chainman 3
2. Surveyor 1
3. Chip Spreader Operator 1
4. Rubber Roller Operator 2
5. Mechanical Sweeper Operator 1
6. Dump Truck Driver 4
7. Bitumen Distributor Operator 1
8. Transport Light Truck Driver 1
9. Pick-up Driver 1
10. Flagman 2
11. Experienced Labor 8
B. Equipment
1. Chip Spreader 2
2. Mechanical Sweeper 1
3. Rubber Roller 2
4. Bitumen Distributor 1
5. Dump Truck 4
6. Transport Light Truck 1
7. Pick-up 1
Two thousand meters of half lane width are expected to be placed each day, that is to say, one thousand meters of full lane width per day.
C. Method Statement
Layer pavement method is adopted for double surface dressing. Usually by this method, a layer of bitumen shall be first spread followed by the spreading of a layer of aggregate. The construction procedure of double surface dressing is indicated below:
The details of procedure as following:
Preparation of surface
Ahead of double surface dressing construction, clean surface should be prepared so as to expose the majority of aggregate. Meanwhile, bumpy and rough road sections must be repaired and leveled. The weatherglass will be used to monitor the temperature of the road surface, whenever the temperature of the road surface falls below the temperature that be depicted in section 4304(a) of the Standard Specification for Road Works, no blinder shall be sprayed. No bituminous work shall be done during foggy or rainy weather.
Where newly constructed base or shoulder areas are to be sealed, the surfaces shall be checked for compliance with the surface tolerances and all other requirements specified. Any portions that do not meet t