XXXX大学本科学生毕业设计(论文)
山西阳煤集团新元煤炭有限责任公司
年产400万吨新井初步设计
学 生:
学 号:指导教师: 姚 精 明
专 业: 采矿工程
XXXX大学资源及环境科学学院
二〇一〇年六月Graduation Design(Thesis) of Chongqing University
Preliminary Design(4000kt/a)for The Xinyuan Coal Limited Liability Company of Yangquan Coal Group in Shanx
Undergraduate:Yao Junwei
Supervisor:Yao Jingming
Major:Mining Engineering
College of Resources and Environmental Science
Chongqing University
June 2010
摘 要
本设计通过详细介绍公司的井田概况和地质特征,经过一系列的方案论证比较,选择了适合本矿井的开拓方式、采煤方法和各生产系统。井田内地质构造比较简单,走向较长,西翼为纵贯井田南北的草沟背斜,属于高瓦斯矿井,煤尘有爆炸危险;本井田主要有两层可采煤层,按埋藏深度从浅到深分别为号、号煤层,平均厚度分别为2.77m、3.32m,煤层倾角5o~9o,平均6o,属于近水平煤层。经过技术经济比较,煤矿设计生产能力为400万t/a,服务年限为76.6年,对第一水平选择了立井开拓方案,首采区的采煤方法采用倾斜长壁采煤法,综合机械化回采工艺。辅助运输系统与主运输系统相分离,其中主运输系统采用胶带运输、立井箕斗提升煤炭,辅助运输系统采用蓄电池机车运输,可满足人员、机械设备、材料和矸石的运输,无需中间转载,可从井底车场直达工作面。矿井一水平前期采用中央并列式通风,后期采用分区式通风系统。
总之,通过技术经济等多方面的比较得出本设计的开拓方案、采煤方法等均能满足矿井的开采需求。
关键词:立井开拓条带式倾斜长壁采煤法综合机械化采煤中央并列式通风
ABSTRACT
This design introduces coalfield’s genneral situation and geologic characteristic of Xinyuan Coal Limited Liability Company of Yangquan Coal Group in detail. Based on a series of technique and economy comparisons, the suitable mine development scheme,mining method, mine’s (working area’s) openings and each main production system have been determined. The geologic structure in the coalield is simple,the main structure is Caogou Anticline acrossed the field from south to north. The mine has high gas and danger of coal-dust explosion. The designed main coal seams have two layers, including 3# coal seam and 4# coal seam from shallow to deep. Their average thickness is 2.77m and 3.32m respectively. Their angle of dip is 5o~9o, the average is 6o, so they belong to flat seams.The designed capacity of the mine is 4 million t/a and the expected life of the mine is 76.6 years. Based on technique and economy comprisions, the design chooses vertical shaft development for the first level, adopts long wall mining method along the dip and comprehensive
您可能关注的文档
最近下载
- 湖南农大《作物栽培学》各论-玉米栽培.ppt VIP
- 在线网课学堂《食品毒理学(天科)》单元测试考核答案.pdf VIP
- 中国传媒大学-实用播音教程-普通话语音和播音发声(一)-课件.pptx VIP
- 2025中国资源循环集团有限公司子公司纪委书记岗位招聘8人笔试参考题库附答案解析.docx VIP
- 2025中国资源循环集团有限公司子公司纪委书记岗位招聘8人考试备考题库及答案解析.docx VIP
- 在线网课学堂《课堂教学能力综合训练》单元测试考核答案.pdf VIP
- 2025中国资源循环集团有限公司子公司纪委书记岗位招聘8人笔试历年参考题库附带答案详解.docx VIP
- 消化道出血课件总结.pptx VIP
- 北师大版八年级上册数学《一次函数的应用》一次函数教学说课课件.pptx VIP
- 新系列建筑标准设计图集目录.pdf VIP
原创力文档


文档评论(0)