  • 举报
井场作业标准 Wellsite Procedure (slam combination + hdip+fmt+vsp+swc) 到达井场后,井口协助大车司机对好井口,放好垫木,并把所有的源卸下来,设立安全区。 After the crew arrived to the wellsite , operators help drivers line up the wellhead with the Logging truck , and unload the source from the truck to the safety area . 操作工程师向井场监督询问有关数据,把套鞋,井深,仪器重量,测量井段,重复井段的数据放到绞车面板上。 Operating engineer ask the geologist the wellsite information , including the casing shoe depth, TD, instrument weight and length, measured interval , repeat section . 其他人员卸下所有将要下井的仪器和井口设备线。 All the other person unload the primary downhole tools and all the cable , including T