- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
**市河河道整治工程设计
断面方案
Abstract
SangYu river, this regulation period through jiyuan Ju river entrance from dimness - all for 1950 meters length of section, in order to protect the river to the lives and property of the people on both sides of masses, so safe for this river regulation engineering, the main contents of this design is: selected design scheme, design river channel transverse section, the water line, derive river levee centerline design, design, river channel revetment engineering design and baluster, drains, expansion joints, such as the structure design and details the construction organization design quantity statistics and project budget.
The design methods and processes have the following: select section form, rectangular cross-section hydraulic try to calculate, through the Bernoulli equation deduced the water line, then design elevation constructed height; In order to gauge the river bank, stable flood centerline design, first in river to plan, and then the centerline of coarse position of a discount Angle of circular arc modifications, arc radius should be take 3-5 times the surface width; The main design is revetment engineering design, because, it adopts rectangle section section only retaining wall design and check, details the main content of the structure design, including a railing design, drainage design, design, final is adjustable seam the construction organization design quantity statistics and project budget. After the completion of the project will greatly improve the behaviors, reduce the discharge capacity along the river, the river flood area will press pressure in 50 years the peak flow design, 100 years in a check dam, aimless and floodwaters are remarkable, cooperate flood control benefit protection and retaining walls constructed road greening, can increase vegetation, beautify the environment, reducing air pollution, effectively prevent soil erosion gully, avoid siltation near to protect the local ecological environment and enhan
您可能关注的文档
最近下载
- 西门子 go topCT 中文版.pdf VIP
- 复合材料【全套课件】.ppt VIP
- 复合材料 第八章 先进复合材料.ppt VIP
- 人教版八年级物理第九单元《压强》测试题及答案.doc VIP
- 《复合材料学》全套教学课件.pptx
- 复合材料复合材料导论.ppt VIP
- 2025年闽教版(2024)小学英语四年级上册(全册)教学设计(附目录P123).docx
- 冠心病的介绍与治疗PPT.pptx VIP
- 2025云南昆明巫家坝建设发展有限责任公司及下属公司第三季度招聘23人笔试参考题库附答案解析.docx VIP
- 2.2.3 气候——特征和影响因素(课件)八年级地理上册(人教版).pptx VIP
文档评论(0)