- 1、本文档共34页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
学 号
毕业设计说明书
济南市星河饭店给水排水设计
学生姓名 零桂萍 专业名称 给水排水工程 指导教师 穆 荣
环境与市政工程系
2006年 6 月 4 日
济南市星河饭店给水排水设计
摘 要
本设计为济南市一幢20层的综合楼,建筑总高度为73.8m。地上层,地下层Water Supply and Drainage Engineering Design of Xinghe Hotel in Jinan
ABSTRACT
This design is for a 20 floors integrative building in Jinan with a total height of 73.8m in which 20 floors is above the ground and one is basement. The basement is used for equipment with a height of 4.25m in which from the first floor to the third floor is shopping malls, 4th to17th floors is hotel rooms of 3.6 meters heights; 18th to 20th floors is used for apartment-style office.
This design includes the water supply system design, the drainage system design, the hot-water system design, the hydrant water supply system design and the sprinkler system design.
Water supply systems: the water supply model of this building is zoned water supply. There is no water apparatus in basement where do not need water supply. In this building, 1st~3rd floor is lower zone, which is down-feed mode directly supplied by the municipal water supply network; 4th~12th floor is the central zone which is down-feed mode supplied by frequency conversion governor pump; 13th~20th floor is high zone which is uplink and down water-supply mode supplied by water pumps and roof tanks.
Drainage system: the drainage system of 4th-20th floor is separate mode for feces wastewater and other wastewater, including three standpipes and stack vent. The drainage system of 1st-3rd floor is combined system which is drained to the outside drainage system.
Hot water system: This building uses a centralized hot-water supply system which consistent with water supply systems. 4th-12th floor is central zone and 13th-20th floor is high zone. As the points of distribution in 1st-3rd floor are less, there is not a hot water supply system there. Hot-water system in each zone is independent, using volume mode water heaters and concentrated layer equipment insta
您可能关注的文档
- 大学毕业论文---施组设计说明书.doc
- 大学毕业论文---旅游业信息化服务平台的设计与开发说明书.doc
- 大学毕业论文---旋转折叠自行车设计与研究.doc
- 大学毕业论文---无刷直流电机控制系统的设计及仿真.doc
- 大学毕业论文---无刷直流电机控制系统的设计及仿真正文.doc
- 大学毕业论文---无线局域网的网络规划技术研究.doc
- 大学毕业论文---无线供电系统的设计.doc
- 大学毕业论文---无线温湿度监测系统设计.doc
- 大学毕业论文---无线点餐系统正文、结论、参考文献.doc
- 大学毕业论文---无线系统中天线特性分析软件的编制.doc
- 第十一章 电流和电路专题特训二 实物图与电路图的互画 教学设计 2024-2025学年鲁科版物理九年级上册.docx
- 人教版七年级上册信息技术6.3加工音频素材 教学设计.docx
- 5.1自然地理环境的整体性 说课教案 (1).docx
- 4.1 夯实法治基础 教学设计-2023-2024学年统编版九年级道德与法治上册.docx
- 3.1 光的色彩 颜色 电子教案 2023-2024学年苏科版为了八年级上学期.docx
- 小学体育与健康 四年级下册健康教育 教案.docx
- 2024-2025学年初中数学九年级下册北京课改版(2024)教学设计合集.docx
- 2024-2025学年初中科学七年级下册浙教版(2024)教学设计合集.docx
- 2024-2025学年小学信息技术(信息科技)六年级下册浙摄影版(2013)教学设计合集.docx
- 2024-2025学年小学美术二年级下册人美版(常锐伦、欧京海)教学设计合集.docx
文档评论(0)