REVIEW审核:
Function部门 Signature签名 Date日期
SOH Supervisor安卫部 ______________ _______________
AUTHORIZATION 批 准:
Operations Manager _______________ _______________ 工厂运行经理
1. Purpose
Management of change is an integrated part of process safety management (PSM). It is required by DuPont corporate standards that a tracking system be established to manage the change to process. The Process Change Request (PCR) procedure is developed based on corporate standards S21A (process safety management)
The procedure serves purpose to check the practicability and necess
您可能关注的文档
- scottforesman.doc
- SCOUnixWare安装.doc
- scorm2004vs12.doc
- scriptforAP.docx
- SC教育学知识结构.doc
- SC管、MT、TC管、KBG.doc
- SD638型快速救助艇型式试验大纲2013-3-12.docx
- SDcockpitchart.doc
- SD001108远端用户单元ISSUE10.doc
- SC型施工升降机图片及数据.doc
- 2026及未来5年中国水性防晒隔热涂料市场现状数据分析及前景预测报告.docx
- 2026及未来5年中国硬顶盖市场现状数据分析及前景预测报告.docx
- 2026及未来5-10年聚氯乙烯绝缘线项目投资价值市场数据分析报告.docx
- 2026及未来5-10年脚踏式喷雾器项目投资价值市场数据分析报告.docx
- 2026及未来5年中国小花围盘市场现状分析及前景预测报告.docx
- 2026及未来5年中国室内外家具市场现状数据分析及前景预测报告.docx
- 2026及未来5年中国焦炉专用缸砖市场现状分析及前景预测报告.docx
- 2026及未来5年中国涤纶弹力丝油剂市场现状数据分析及前景预测报告.docx
- 2026及未来5年中国纳米抗菌袜市场现状数据分析及前景预测报告.docx
- 2026及未来5年中国电泳剪市场现状分析及前景预测报告.docx
原创力文档

文档评论(0)