- 1、本文档共98页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
* * A production order is always created on the basis of an order proposal. During order creation, data can be copied from the planned order as well as from the selected routing. There are different ways of creating a production order. * * * * * Production orders are managed using statuses. When the order is released, the system activates a corresponding status in the order. Order release must be carried out manually. An availability check can be carried out automatically. Order release is the basis for may follow-up processes in the production order (printing order documents, material issues, and so on). You can release an individual operation, the entire order or several orders at the same time. * * * * * * * * * * * * * * * * * * * * * In MPS, the master 排程 items are 计划, that is, the planning run is carried out at critical part level only. 非独立需求uirements are 创建d for the BOM level directly below the planning level. Levels below this, however, are not 计划. This means that you can authorize any changes to the master plan before they affect the various BOM levels. This procedure ensures that planning remains consistent and transparent. The results of the planning run are not passed on to dependent parts until the master plan for the critial parts has been processed and finely tuned. This planning run can be carried out both as total planning and as single-item planning. In a second step, it is possible to start material 需求s planning for all BOM levels from MPS. * * * * * * * * * * * * In the stock/需求s list, the most up-to-日期 development of stocks and 需求s is displayed. The layout of the list on the screen is the same as that of the MRP list. By means of the ATP 数量 (Available To Promise), the MRP 控制者 can determine if all issues are covered by the master plan and how much of the receipt 数量 is still available for new issues. During the ATP 数量 calculation, therefore, the system checks that all issues are covered by existing receipts and whether quantities are left over to
文档评论(0)