Construction procedure for Pre Testing.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ConstructionprocedureforPreTestingConstructionprocedureforPreTesting

Construction procedure for Pre Testing Contract No.: Document No.: A1 2006-6-17 ISSUED FOR REVIEW Du Zhongyuan Zeng Zhaocheng Li Jianhui REV DATE DESCRIPTION PREPARED BY REVIEWED BY CHECKED BY APPROVED BY Contents 1. General 3 2. Procedures 3 3. HSE 6 4. Quality Assurance 6 1.0 General 1.1 Scope This procedure provides a detailed method of pre testing for 48” East-west Gas Pipeline Project in Indian. 1.2 References 1.2.1 Company document EWP100-P30-J00-513 Specification for Bored Crossings EWP100-P30-J00-509 Specification for Flushing, Gauging and Hydro testing EWP100-P30-J00-505 Specification for Pipeline Welding EWP100-P30-J00-506 Specification for Construction of Pipeline EWP100-P30-J00-515 Specification for Dewatering and Pre-commissioning 1.2.2 Project documents C-70-P-Q-0006-00 Project HSE Plan C-70-P-Q-0002-00 Construction Quality Control Plan 2.0 Procedures 2.1 Hydrostatic pre-test execution 2.1.1 Temporary pressure test system The pipe spools shall be welded and tested above ground in proper and safe location as approved by Company. Each string shall be fitted with test ends and filled with water supplied through tankers. Filling shall be carried out from the lowest point and venting air from the highest point (see sketch below). 2.1.2 Filling Water and Venting Air While opening air vent valve, water filling pump shall start filling till water overflow from venting valve, closing the valve and stop the water filling pump. To let air in the pipe vent out completely, water shall be filled at lower point and air shall be vented at high point of tested pipe. 2.2 Pipe Test 2.2.1 Preparation of Pressure Test All the temporally facilities connected with pipe shall be inspected All the instruments have been calibrated (pressure gauges, ambient and pipe thermometers. Water purity. Test headers ha

文档评论(0)

pkaokqunw + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档