- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ContractFinishingWorksF01-01ContractFinishingWorksF01-01
CONTRACT AGREEMENT NO. F01/05-01
Project: Shanghai Expo Finland Pavillion
Subject: Finishing works
Date: 16.11.2009
Employer: Finland Section (Finpro) of EXPO 2010
Room 401, # 2 Building, 690 Bibo Road,
Zhangjiang, Shanghai 200041
P.R. China
Contractor: Shanghai East Asia Union Decoration Co., Ltd.
4F, 381 Suzhou Road South
Huangpu District, Shanghai 200002
P.R. China
This Contract Agreement is a formal confirmation, with the terms and conditions of the Contract Award according to the Letter of Intent issued on _26_/_10__/_2009_. The contents and the conditions of this Contract Agreement are agreed during the Contract Agreement meeting for which the official Minutes of the Meeting have been prepared and undersigned by both parties.
The agreed Contract Sum, including all local and national taxes and statutory fees is:
RMB 6,933,445.80
(say: six million nine hundred thirty three thousand four hundred forty five and eighty cent)
Hourly fees mentioned in the following Particular Terms and Conditions of this Contract, point 5.11 will be used only in case that pricing with agreed unit prices is not possible. These kinds of works always need a written order from the Employer before starting of works.
Contract Agreement documents and order of priority
1. Contract Agreement and Particular Terms and Conditions of Contract
2. Letter of Intent
3. Minutes of Contract meeting and minutes of technical clarification meeting
4. Contract Breakdown; Bill of Quantities and Contract Payment Schedule
5. Contract time schedule
6. Responsibility Matrix
7. Work Specifications and Drawings
8. Employer’s Health Safety and Environmental Instructions
9. Conditions of Contract (FIDIC Conditions of Contract for Construction, First Edition 1999)
10. Contractor’s organization plan, quality assurance plan and safety plan drafts
This Contract Agreement has been prepared in two original copies, one to each contracting par
您可能关注的文档
- Casefull.doc
- CAS官方文档.doc
- Catholic Theology.doc
- CATTI笔译必备句子范例.doc
- CNA ITN 第 9 章考试CCNA ITN 第 9 章考试.doc
- CCSA基本词汇CCSA基本词汇.doc
- CCS使用注意项CCS使用注意项.docx
- CED001 工程项目管理制度 20121231.doc
- CDR最新题库.doc
- CTV5背景音乐大全(顶级珍藏版)CCTV5背景音乐大全(顶级珍藏版).doc
- Controlled Economy of China during the Sino-Japanese War.doc
- Contrastive studies of personal names in Chinese a.doc
- Convergence of Sino.doc
- conversation.doc
- control the fire development.doc
- Convolution Matrices for Signal Processing Applications in MATLAB.doc
- Cooperate to deadly enemy, general merchandise course of study is how adversity seeks to live on.doc
- Cooperations with Aconf.docx
- COP401文件控制程序(绿地).doc
- Corporate secretarial services on construction space.doc
文档评论(0)