- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
余热锅炉基础专项施工方案余热锅炉基础专项施工方案
余热锅炉房基础专项施工方案
Construction Scheme of HRSG Hall Foundation
编制依据及说明
Compilation Basis and Description
编制依据 Compilation basis
《余热锅炉房基础施工图》 F681S-T030307;
图纸会审记录;
《电力建设施工质量验收及评定规程 第1部分:土建工程》 DL\T 5210.1-2005
《建筑地基基础工程施工质量验收规范》 GB50202-2002
《混凝土结构工程施工质量验收规范》 GB50204-2002
1.1 Compilation basis
“Construction Drawings of HRSG Foundation Hall” F681S-T030307;
“Record of Counter-sign of Drawings”;
“Quality Acceptance and Valuation Code of Electric Power Construction, Section 1, Civil Work Part” GB50202-2002
“Quality Acceptance Specification of Building Sub-grade and Foundation Work” GB50202-2002
“Quality Acceptance Specification of Concrete Structure Work” GB50204-2002
编制说明
Description
1#、2#、3#余热锅炉基础总体布局相同,结构形式一样,功能也相近,故3个机组基础施工同时考虑,编写在同一方案中;
① The general plan layouts of 1#、2# and 3# HRSG foundations are the same, as well as the structures and functions. So three HRSG foundations work will be considered into one construction scheme.
余热锅炉基础包括垫层、基础承台、连系梁、短柱等几部分,本方案同时考虑,不另行编制方案;
② The HRSG foundation covers bedding course, foundation cushion cap, collecting beams and short columns etc which will be compiled in this scheme.
基础与上部框架采用螺栓连接,螺栓及固定架由厂家提供;
③ Adopt Bolts connecting on the foundation and top frames, the bolts and fixed frames will be supplied by manufacturer.
地基处理采用钢筋砼灌注桩,该部分已由打桩公司完成,基础土石方开挖已在工程桩交接前基本完成,本方案中均不再赘述。
④ The reinforced concrete caisson pile is used for sub-grade treatment. This job has been finished by pile driving company, As earth and stone excavation of the foundation has been basically completed before pile driving, so there is no other instruction about it in this scheme again.
工程概况 Summary of Work
余热锅炉露天布置arrangement of HRSG is separated by three parts, 1#, 2# and # foundations, respectively set on the axis line B-14~13、B-9~8 and B-4~3 of GT hall area. The lateral length is 12.8m, longitudinal length is 47.5. The space between HRSG foundation axis lines is 48.5m.
余热锅炉基础,承台型除了CT-5、CT-6为大体积基础,CT-1~CT-4为14个桩基基础,其余均为独立基础19个。基础间采用连系梁连成整
文档评论(0)