[031107附件安全操作规范英文

Contents 1. GENERAL 2 2. Explosive Materials 2 3. Transport 2 4. Storage 3 5. Taking and Return of the Blasting Material 3 6. Caution 4 7. Blasting 4 8. Return and Disposal 5 APPENDIX CCMD JV SAFETY RULES OF BLASTING OPERATION FOR THE MEROWE DAM PROJECT CONTRACT NO.2 1. GENERAL Rock excavation under the Merowe Dam Project is carried out by using the open-cut blasting method with a huge construction quantity and a long construction period and,therefore, a safe and smooth blasting operation is the considerably important. For the purpose of ensuring a safety and smooth blasting operation, a spec