[外文翻译,杨林.doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
[外文翻译,杨林

毕业论文(设计)外文翻译 题目:浙江电网2008年的应急实践 学院专 业班 级学 号学生姓名指导教师The Risks Analysis and Defensive Measures Research of Cascading Failures in China Southern Power Grid 作者:Chen Yiping ,Zhao Manyong, Liu Wentao and Liu Miao: 出处:CSG Power Dispatching Communication Centre, Guangzhou 510623, China Abstract— Blackouts of power systems are mainly caused by cascading failures, and the major reasons for cascading failures of the power grid are multiple failures due to extreme weather, hidden failures of protection and weaknesses in network topology. Based on the analysis and summarization of the historical accidents, this paper studies the risks of cascading failures in China Southern Power Grid (CSG) from multiple perspectives. By improving the preventive control measures, increasing the ability for failure analysis of complex incidents, developing emergency control measures and building up practical technical tools to handle cascading failures, CSG has triumphantly dealt with several complex incidents and effectively controlled the risks of cascading failures. Key words— China Southern Power Grid (CSG),cascading failure,defensive measures I.INTRODUCTION Research shows that, Blackouts of power systems are mainly caused by cascading failures [1-2]. These Blackouts tend to start from a certain component of the system, and because of inappropriate or slow control measures, unreasonable power grid structure, mal-operation of relay protection, or the full play of the above reasons, a series of component failures are thus caused, finally lead to a large area power grid failure. China Southern Power Grid, as a large grid with AC-DC hybrid operation, its running performance is complicated, the corridor of main circuit line is relatively concentrated, along which the geographical environment is severe with complex weather conditions, so cascading failures are likely to happen. Therefore, analyzing risks of existing cascading failures and developing corresponding emergency

您可能关注的文档

文档评论(0)

xiaoyi2013 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档