流化床锅炉冷渣机 济东电厂初设及循环流化床冷渣器设计_图文.docVIP

流化床锅炉冷渣机 济东电厂初设及循环流化床冷渣器设计_图文.doc

  1. 1、本文档共41页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
流化床锅炉冷渣机 济东电厂初设及循环流化床冷渣器设计_图文

流化床锅炉冷渣机 济东电厂初设及循环流化床冷渣器设计_图文 导读:就爱阅读网友为您分享以下“济东电厂初设及循环流化床冷渣器设计_图文”的资讯,希望对您有所帮助,感谢您对92的支持! The ash outlet at the FBAC overflow is designed with a solid mass flow density of approximately 10 kg/m2s. The height of the FBAC overflow outlet is the same as that of the weir between the first and second chambers. The freeboard height is 1000 mm and the gas velocity in the freeboard towards the overflow does not exceed 3 m/s so as to suppress the entrainment of fine particles. Typically, the gas return duct located at the FBAC overflow is designed with a gas velocity of approximately 12 m/s. The return duct enters the lower furnace at a height of 5 m above the nozzle grid and with an inclination of approximately 25°. In the section of the return duct that leads into the furnace, the velocity is increased to 25 m/s to improve penetration into the furnace. The duct can be made of heat resistant steel or be refractory lined. The elbow is lined with abrasive resistant material. The pressure drop of the FBAC fluidization nozzles is 400 mmH2O under the design conditions as in Section 4.1, and the pressure drop in the fluidized bed is considered, the pressure in the wind box should be 2600 mmH2O. To maintain an equal nozzle pressure drop over the FBAC area, different nozzles for the different fluidization zones are required, as for the Air Distributor Ⅱ. Fig.16. Bottom ash PSD. 6. Conclusions 1) With an increase in air flow, the conveying ash flow and air pressure in each wind box increases. However, after the air flow reaches a ce

您可能关注的文档

文档评论(0)

raojun0010 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档