6Sigma绿带基础导论.ppt

  1. 1、本文档共50页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
* * In the previous section, the team identified the measures that are needed to evaluate how the process under review is currently performing. These measures directed the data collection that now provides the team with actual performance data on the process. In this section, Analyze Opportunity, the team will learn and apply a number of tools and techniques for analyzing the data and drawing data-based conclusions about why the process is performing as it is. These findings may lead the team toward additional data collection or allow the team to jump into the root cause analysis tools that play such an important role in effective problem solving. The output of this section are verified root causes that will eventually be reduced or eliminated by the team’s solutions. 24 * * * This is the final section of the Sigma Improvement Process for performance improvement. Control is also the phase of the methodology where a team is able to capitalize on its investment in time, analysis, and creativity to achieve real, measurable business improvement building on relevant output from previous phases. Improvement plans are designed to change processes and behaviors that result in increased customer satisfaction and business performance. The basis for Controlling Performance is the Plan - Do - Check - Act cycle. The team is now prepared to pilot improvements, allowing each successive “expansion” of the solution to be validated and improved. Improvements are then institutionalized and monitored with control plans to measure sustained results. Upon completion of this step, the business will have achieved measurable improvement and taken a significant step toward adopting 6 Sigma for continuous improvement. 26 * * The main purpose of this step is to define the project. The Define step establishes the nature of the upcoming work through the Charter and the Product/Service Generation Plan. Projects which do not define their objectives, develop a plan, assign roles and res

文档评论(0)

4477769 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档