- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
job hazard analysis- bridge work(工作危害分析——桥工作)
JOB HAZARD ANALYSIS 1. JOB TITLE: Bridge Work.
2. DATE: x NEW
( REVISED INSTRUCTIONS ON REVERSE SIDE 3. TITLE OF WORKER(S): Maintenance Worker Leader, Maintenance Workers, Laborers.
4. NAME OF ORGANIZATION:
Rocky Mountain National Park ANALYSIS BY: 5. LOCATION: RMNP—All Trails
6. DEPARTMENT: Maintenance--Trails
10. SUPERVISOR: REVIEWED BY: 11: REQUIRED AND/OR RECOMMENDED Hard hat, ear eye protection, long sleeves, gloves, chaps, good boots, respirator,
PERSONAL PROTECTIVE EQUIPMENT: APPROVED BY:
JOB HAZARD ANALYSIS: Bridge Work 7. SEQUENCE OF BASIC JOB STEPS 8. POTENTIAL HAZARDS 9. RECOMMENDED ACTION OR PROCEDURE Prepare for work. Injuries or property damage resulting from lack of knowledge, communication, equipment, or training. -Our most important achievement is for every employee to conclude each and every day without personal injury or damage to property.
-Employees are provided adequate orientation, equipment and training as per their duties and responsibilities.
-Employees participate in and support an environment where all valid safety concerns can be raised and addressed, without judgement or reprisal. Injuries or property damage resulting from lack of PPE and/or training. -Crew leaders and supervisors are responsible for providing crewmembers with adequate PPE and related training. Refer to block 11 above. Prepare for work: safety meetings. Injuries or property damage resulting from lack of knowledge, communication, equipment, or training. -Crew leaders and supervisors will conduct and document weekly safety meetings to discuss safety issues, projects, and other work related topics.
-Crew leaders will also conduct, whenever appropriate, ‘tailgate’ safety meetings with crews to provide project orientation, assign work, and avoid miscommunication. Prepare for work: communication. Injuries or property damage resulting from lack of communication. -Good communication between crewmembers should rein
您可能关注的文档
- infant feeding- california departmentof public health(婴儿喂养——加州departmentof公共卫生).doc
- informal phonics inventory- curry schoolof education(非正式的发音库存——咖喱学院教育).doc
- information, proceduresand playing rules(信息,proceduresand玩规则).doc
- initial project information document( p i d)(最初的项目信息文档(p i d)).doc
- inno- stageof excellence award(创新——stageof卓越奖).doc
- instructionsforprintingbudgetrevisionformto(instructionsforprintingbudgetrevisionformto).doc
- instructionsforthe miniguide mobility aid- sendero g p s(——光明之g p s instructionsforthe miniguide流动性援助).doc
- instructionsforusingstockerfeedercattlespreadsheettools.doc
- integrated pest management–( thisinformationiscopiedfrom(综合病虫害管理——(thisinformationiscopiedfrom).doc
- intelligence analysisand production- d h s e m home(情报分析及生产- d h s e m回家).doc
- 专卖店促销员销售与成交技巧培训课件(34P).pptx
- 红色商务风新员工入职销售技巧知识培训课件(34P).pptx
- 专卖店商场销售员销售与成交技巧培训课件(34P).pptx
- 小区物业保安法律知识培训课件(28P).pptx
- 专卖店销售员轻松成交技巧培训(34P).pptx
- 轻松成交客户新员工入职通用销售技巧知识培训(34P).pptx
- 2024年初级《银行业法律法规与综合能力》考前必刷必练题库500题(含真题、必会题).docx
- 2024年“新安法知多少”知识竞赛题库及答案(最新版).docx
- 2024年30秒毕业生面试工作自我介绍.docx
- 2024年《医务人员礼仪培训》心得体会.docx
文档评论(0)