m i n o r r e v i s i o n n o- environmental protection agency(m i n o r r e v is i o n n o -环境保护署).doc

m i n o r r e v i s i o n n o- environmental protection agency(m i n o r r e v is i o n n o -环境保护署).doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
MINOR REVISION NO. 48503 to Air Quality Control Permit No. 42704 for Apache Nitrogen Products, Inc. MINOR PERMIT REVISION DESCRIPTION This minor permit revision authorizes Apache Nitrogen Products, Inc. to modify the Prill Plant by replacing the existing Rotary Predryer, Fluidized Bed Dryer/Cooler, Rotex Vibrating Screen, Coating Drum, Belt Conveyor 1a, Bonded Belt Conveyor, and Cleated Belt Conveyor with replacement equipment including a Rotary Predryer, Dryer, Fluidized Bed Cooler, Rotex Vibrating Screen, Coating Drum, Belt Conveyor 1b, and Transfer Belts 1 and 2. This minor permit revision also allows for the removal of the two wet cyclones installed at the Rotary Predryer, removal of the three wet cyclones installed at the Fluidized Bed Dryer/Cooler, removal of material transfer equipment, addition of a Tower Air Conditioner, and addition of an Oscillating Transfer Conveyor. Furthermore, the Low Density Prill Tower and Barn to Barn Conveyor will be modified with this minor permit revision. The change meets all the gatekeepers of A.A.C. R 18-2-319.A. ATTACHMENT “B”: Specific Conditions Addenda (Minor Revision) to Air Quality Permit No. 42704 XII. AMMONIUM NITRATE PRILL PLANT The following conditions are added to Attachment “B” of Air Quality Control Permit No. 42704. Upon completion of the proposed changes, the Permittee shall comply with this Section. The Prill Plant permit conditions found in Section IV of Attachment “B” will be superseded by the following conditions upon startup of the new equipment. A. Notification Requirements 1. The Permittee shall submit notice to the Director, in writing, when construction begins on the Prill Plant Modifications. 2. The Permittee shall submit notice to the Director, in writing, when all construction is complete and the facility is ready for startup. B. Applicability This Section is applicable to the following: Ammonium Nitrate Prill Plant (Prill Plant) that consists of the following affected equ

您可能关注的文档

文档评论(0)

bgl001 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档