- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
section312323.33-flowablefill
Modifications/Changes in this update Department of Veterans Affairs ( Office of Construction Facilities Management
DATE SUBMITTED: 10/01/12
DESCRIPTION OF DOCUMENT: (previous section title, number and date)
31 23 23.33 Flowable Fill (04-05M)_________________________________
REVISION / EFFECT:
Modifications include updating references, and adding requirement for sampling and approval of fill material.
SECTION 31 23 23.33FLOWABLE FILL
SPEC WRITER NOTE: Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. Use this section when the potential exists for soil backfill conditions where it will not be possible to provide specified compaction of fill or backfill as a result of limited or restricted space or access conditions.
PART 1 GENERAL
1.1 INTRODUCTION:
A. Flowable fill refers to a cementitious slurry consisting of a mixture of fine aggregate or filler, water, and cementitious material(s), which is used as a fill or backfill in lieu of compacted earth. This mixture is capable of filling all voids in irregular excavations and hard to reach places (such as under undercuts of existing slabs), is self-leveling, and hardens in a matter of a few hours without the need for compaction in layers. Flowable fill is sometimes referred to as controlled density fill (CDF), controlled low strength material (CLSM), lean concrete slurry, and unshrinkable fill.
B. Flowable fill materials will be used as only as a structural fill replacement on VA projects. // Unless otherwise noted, flowable fill installed as a substitution for structural earth fill, shall not be designed to be removed by the use of hand tools. // The materials and mix design for the flowable fill should be designed // to produce a comparable compressive strength to the surrounding soil after hardening, making excavation at a later time possible // to produce the compressive strength indicated for t
您可能关注的文档
- scopeofwork-oregonstateuniversity.doc
- scourcriticalbridge-planofaction(5页).doc
- scourcriticalbridge-planofaction.doc
- sdoacscoordinatesystems.doc
- seatingmobilityevaluation-catea(12页).doc
- seatingmobilityevaluation-catea.doc
- secondaryschoolcurriculumandcourseselection(55页).doc
- secondaryschoolcurriculumandcourseselection.doc
- secondexamination–finance3321.doc
- secretserviceinsouthafrica(133页).doc
- section316329-drilledconcretepiersandshafts(11页).doc
- section316329-drilledconcretepiersandshafts.doc
- section321373–concretepavingjointsealants-dowcorning.doc
- section329200-turfandgrasses-productmasterspec(23页).doc
- section329200-turfandgrasses-productmasterspec.doc
- section-avhf-dscequipment&operation;(50页).doc
- section-avhf-dscequipment&operation;.doc
- seismiceventlocationsbytri-partitearrayanalysisand(22页).doc
- self-assessment-module3-5gasmovement.doc
- sept8-ohiostateuniversity(15页).doc
文档评论(0)