technicalspecificationforroadworks(13页).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
technicalspecificationforroadworks(13页)

P-1 Technical specification FOR Road works 1.0 GENERAL 1.01 The specifications and mode of measurements for all the works mentioned in this tender shall be in accordance with C.P.W.D specifications 1996 volumes I to VI. Unless otherwise specified in the nomenclature of individual item or in the specifications, the entire work shall be carried out as per the C.P.W.D specification with upto date correction slips upto the date of opening of tender. 1.02 For Items not covered under CPWD specifications mentioned above, the work shall be executed as per “Specifications for Road Bridge Work” published by Ministry of surface transport, “Hill Road Manual” (IRC:SP:48-1998) published by the Indian Road Congress, and as per relevant standards/codes published by BIS (formerly ISI) inclusive of all amendments issued thereto or revision thereof, if any, upto the date of opening Tender. 1.03 In case of BIS (formerly I.S.I) codes/specifications are not available, the decision of the Engineer based on acceptable sound engineering practice and local usage shall be final and binding on the contractor. 1.04 However, in the event of any discrepancy in the description of any item as given in the schedule of quantities or specifications appended with the tender and the specifications relating to the relevant item as per CPWD specifications mentioned above or in drawings the former shall prevail. 1.05 The rates for different items of work shall be for all heights, lifts, leads and depths except where otherwise specified in the item of work or in additional conditions appended with the tender. 1.06 The work shall be carried out in accordance with the approved drawings. The drawings shall have to be properly co-related before executing the work. In case of any difference noticed between the drawings, final decision, in writing of the Engineer shall be obtained by the contractor. For items, where so required, samples shall be prepared before starting the particular items

文档评论(0)

Bnr310822 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档