howdoesanestimatorestimatethecostofaconstructionproject(h o w d o e s a n e s t i m a t o r e s t i m a t e t h e c ostofaconstructionproject).docVIP

  • 7
  • 0
  • 约3.5万字
  • 约 29页
  • 2017-01-19 发布于湖南
  • 举报

howdoesanestimatorestimatethecostofaconstructionproject(h o w d o e s a n e s t i m a t o r e s t i m a t e t h e c ostofaconstructionproject).doc

CONSTRUCTION COST DATA WORKBOOK Neil Sinclair, Philip Artin and Stewart Mulford DMS International Conference on the International Comparison Program World Bank Washington, D.C., March 11-14, 2002 Collection of construction cost data Workbook modified bills of quantity format Introduction DMS International, Inc. was requested to assist the World Bank with creating a method of collecting construction cost data from member countries throughout the world to assist with economic studies. The task of data collection is a difficult procedure and can be prone to wide variati

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档