t r a i n i n g o u t l i n e f o r h u r c o c o n v e r s a t i o n a l p a r t a n d t o o l p r o b i n g(t r a i n g o u n i t l i n e f o r h u r c o c o n v e r s a t i o n a l p a r t a n d t o o l p r o b i n g).docVIP

  • 41
  • 0
  • 约9.86千字
  • 约 9页
  • 2017-01-19 发布于湖南
  • 举报

t r a i n i n g o u t l i n e f o r h u r c o c o n v e r s a t i o n a l p a r t a n d t o o l p r o b i n g(t r a i n g o u n i t l i n e f o r h u r c o c o n v e r s a t i o n a l p a r t a n d t o o l p r o b i n g).doc

PART PROBE INSTALLATION: Disassemble the MP700 probe body, set the appropriate dipswitches within the body per the Hurco drawing. The switches as a default from Renishaw are not to Hurco standards. Refer to the supplied MP700 Renishaw manual for assembly instructions and location of switches. Switch settings: SW1-1=off, SW1-2=off, SW1-3=on, SW1-4=off. Switch settings: SW2-1=on, SW2-2=off, SW2-3=off, SW2-4=on. Insert the MP700 probe assembly into the spindle. Indicate the Ruby stylus to obtain a maximum run out of .0002”. Adjust the 4 grub screws in the alignment plate to achieve run out. Ref

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档