- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
MILESTONE 2 – PROBLEM ANALYSIS
Synopsis
T
here’s an old saying that suggests, “Dont try to fix it unless you understand it.” With those words of wisdom, the next milestone of our project is to study and analyze the existing system. There is always an existing system, whether computerized or manual or some of both. The problem analysis phase provides the project team with a more thorough understanding of the problems, opportunities, and/or directives that triggered the project. Indeed, the analyst frequently uncovers new problems and opportunities. The problem analysis phase may answer the questions, “Are the problems worth solving?” and “Is a new system worth building?”
The purpose of the problem analysis phase is threefold. First and foremost, the project team must gain an appropriate understanding of the business problem domain. Second, you need to answer the question, “Are these problems (opportunities, and directives) worth solving?” Finally, you need to determine if the system is worth developing. The problem analysis phase provides the systems analyst and project team with a more thorough understanding of the problems, opportunities, and/or directives that triggered the project. In the process, they frequently uncover new problems and opportunities.
In this milestone you will perform Cause-Effect Analysis and document your findings using the Problems, Opportunities, Objectives, and Constraints Matrix. The PIECES framework, originally developed by James Wetherbe, and then adapted by the authors, can serve as a useful tool to classify the various problems, opportunities, and directives identified in Milestone 1.
Objectives
After completing this milestone, you should be able to:
Perform Cause-Effect Analysis to be able to thoroughly understand a system’s problems, opportunities, and/or directives that triggered the project.
Use and understand the PIECES framework for classifying problems, opportunities, and directives.
Complete the Problems, Opportunities, O
您可能关注的文档
- 090721的新旅行庆典.ppt
- 105884的_Ryder.ppt
- 201008的23解析天赋少年教育计划.doc
- 201403的23校本课程的开发实施与个案研究(1.doc
- A Blac的k-Box approach to machine learning.ppt
- A intr的oduction to Database Management System Raghu Ramakrishnan.doc
- abaqus的问题.doc
- Advanc的es and challenges in the development of power-generation systems at small scales.doc
- Americ的an and British Education System.ppt
- An int的roduction to Bayesian Networks and the Bayes Net Toolbox for Matlab.ppt
- CCNA考试的练习题.doc
- CFG桩施工的中常见的问题-质量控制措施及应注意的质量问题.doc
- ch13-I的O Systems.ppt
- Chap02的-Business Information Systems.ppt
- chapte的r 02 The Historical Evolution of EU part 2.ppt
- Chapte的r 5 Metrics Data Analysis in Frequency Domain.ppt
- chapte的r08ClassBasic.ppt
- chinac的loud论文合集.doc
- Classr的oom Management.ppt
- CMOS加法的电路的设计与研究.doc
文档评论(0)