- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
毕业设计论文_关于斜拉桥的中英文翻译 .doc
Study on nonlinear analysis of a highly redundant cable-stayed bridge
1.Abstract
A comparison on nonlinear analysis of a highly redundant cable-stayed bridge is performed in the study. The initial shapes including geometry and prestress distribution of the bridge are determined by using a two-loop iteration method, i.e., an equilibrium iteration loop and a shape iteration loop. For the initial shape analysis a linear and a nonlinear computation procedure are set up. In the former all nonlinearities of cable-stayed bridges are disregarded, and the shape iteration is carried out without considering equilibrium. In the latter all nonlinearities of the bridges are taken into consideration and both the equilibrium and the shape iteration are carried out. Based on the convergent initial shapes determined by the different procedures, the natural frequencies and vibration modes are then examined in details. Numerical results show that a convergent initial shape can be found rapidly by the two-loop iteration method, a reasonable initial shape can be determined by using the linear computation procedure, and a lot of computation efforts can thus be saved. There are only small differences in geometry and prestress distribution between the results determined by linear and nonlinear computation procedures. However, for the analysis of natural frequency and vibration modes, significant differences in the fundamental frequencies and vibration modes will occur, and the nonlinearities of the cable-stayed bridge response appear only in the modes determined on basis of the initial shape found by the nonlinear computation.
2. Introduction
Rapid progress in the analysis and construction of cable-stayed bridges has been made over the last three decades. The progress is mainly due to developments in the fields of computer technology, high strength steel cables, orthotropic steel decks and construction technology. Since the first modern cable-stayed bridge was built in Sweden in 1955, their
您可能关注的文档
- 毕业设计论文_八达岭景区交通场站和接待中心黑龙潭停车场工程施工组织设计 .doc
- 毕业设计论文_公交公司管理系统课程设计.doc
- 毕业设计论文_公交卡管理系统一卡通 .doc
- 毕业设计论文_公交实习论文公交早高峰和晚高峰时期的延误和客流量调查分析.doc
- 毕业设计论文_公交实习论文早高峰和晚高峰43路公交车状况调查.doc
- 毕业设计论文_公交查询系统论文 .doc
- 毕业设计论文_公共事业组织的政府财务监督机制研究 .doc
- 毕业设计论文_公司人力资源管理现状分析与优化路径.doc
- 毕业设计论文_公园硬质铺装的调查研究.doc
- 毕业设计论文_公路大桥扩建江北道路施工组织设计 .doc
- 毕业设计论文_关于浙江经贸职业技术学院在校大学生手机使用情况的调查报告.doc
- 毕业设计论文_关于糖尿病问题的综述论文 .doc
- 毕业设计论文_关于贷款审查中个人征信报告审核要点的意见试题 .doc
- 毕业设计论文_具有n300型机组的丰城发电厂热机部分初步设计1模板.doc
- 毕业设计论文_养老服务和生态综合治理项目ppp项目案例材料 .doc
- 毕业设计论文_养老院创业策划书 .doc
- 毕业设计论文_内圆磨具主轴零件编程设计.doc
- 毕业设计论文_内外磨式核桃破壳机的设计.doc
- 毕业设计论文_内蒙古乌拉特中旗传统乳制品中乳酸菌的分离鉴定.doc
- 毕业设计论文_内蒙草原绿色奶酪食品项目商业计划书 .doc
文档评论(0)