- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
138 FERC ? 62,168
UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION
Ocean Renewable Power Company Maine, LLC Project No. 12711-005
ORDER ISSUING PILOT PROJECT LICENSE
(MINOR PROJECT)
(February 27, 2012)
Introduction
On September 1, 2011, Ocean Renewable Power Company Maine, LLC (ORPC Maine) filed, pursuant to Part I of the Federal Power Act (FPA), an application for an 8-year pilot project license to construct, operate, and maintain its proposed Cobscook Bay Tidal Energy Project No. 12711 (Cobscook Bay Project or project). The 300-kilowatt (kW) project will be located in Cobscook Bay in Washington County, Maine.
Commission staff developed the hydrokinetic pilot project licensing process from the Integrated Licensing Process to meet the needs of entities, such as ORPC Maine, who are interested in testing new hydropower technologies while minimizing the risk of adverse environmental impacts. The goal of the process is to allow developers to test new hydrokinetic technologies, to determine appropriate sites for these technologies, and to confirm the technology’s environmental and other effects without compromising the Commission’s oversight of the projects or limiting agency and stakeholder input.
As outlined in the Commission staff’s pilot project licensing process white paper, a pilot project should be (1) small, (2) short term, (3) located in non-sensitive areas based on the Commission’s review of the record, (4) removable and able to be shut down on short notice, (5) removed, with the site restored, before the end of the license term (unless a new license is granted), and (6) initiated by a draft application in a form sufficient to support environmental analysis. After review of ORPC Maine’s pilot project application, staff concluded that ORPC Maine’s proposal meets these criteria.
As discussed below, this order issues a pilot project license for the project.
Background
The Commission issued public notice of the application, accepti
您可能关注的文档
- 《岩石力学与工程学报》排版格式与论文书写要求(《岩石力学与工程学报》排版格式与论文书写要求)(8页).doc
- 01-lowermorelandtownshipschooldistrictoverview(5页).doc
- 1- capital normal university(1 -首都师范大学)(17页).doc
- 1- cayman islands official tourism website(1 -开曼群岛官方旅游网站)(102页).doc
- 1- councilof european energy regulators(1 -》欧洲能源监管机构)(18页).doc
- 1 interconnectiowithin hong kong(1 interconnectiowithin香港)(284页).doc
- 1- oakland university(1 -奥克兰大学)(43页).doc
- 1 p r o b l e m d e s c r i p t i o n- aegean(1 p r o b l e m d s p c r i t e i o n -爱琴海)(38页).doc
- 1- oo cities- geocities archive geocities mirror(1 - oo城市- your own存档your own镜子)(8页).doc
- 1- recoverybythe sea(1 - recoverybythe海)(8页).doc
文档评论(0)