p u b l i c u t i l i t y d i s t r i c t n o(p u我l c t我l t y d s t r i c t n o).docVIP

p u b l i c u t i l i t y d i s t r i c t n o(p u我l c t我l t y d s t r i c t n o).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
PUBLIC UTILITY DISTRICT NO. 1 OF LEWIS COUNTY METERING SPECIFICATIONS General Metering Requirements Interpretation The District’s metering requirements shall not be interpreted to conflict with the regulations of the State of Washington or other regulatory bodies having jurisdiction. The District’s metering requirements may be more stringent. Meter Location and Accessibility The customer shall provide a location to connect metering equipment. The meter shall be free from obstruction, corrosive atmosphere, abnormal temperature, and convenient to the District’s distribution system. All meters, metering equipment, and enclosures shall be readily accessible by District personnel at all times for meter reading, maintenance, testing, installation or removal. All meter locations shall be subject to approval by the District. For overhead service installations, the meter and point of service attachment shall be located so as to provide proper safety clearance for the District’s service conductor and to allow for an unobstructed path from the District’s distribution transformer to the meter. For underground service installations the meter shall be located so as to minimize the overall length of the service from the District’s transformer to the meter. In the case where the service is installed in conduit, the service conduit run shall not contain any condulets or junction boxes ahead of the meter point, and the service conduit run shall not exceed a total of 180 degrees in bends. All conduit runs shall be subject to approval the District. Meter Sockets Meter sockets may be ring-type or ring-less and the District will supply the ring. The meter ring shall have a screw type locking mechanism. Snap rings are not acceptable. Meter socket height shall be a maximum of 7 ft. (6 ft. preferred), and a minimum of 5 ft. above finished grade or floor. The center of the meter socket is always the point of reference. When a meter socket enclosure is recessed in the b

您可能关注的文档

文档评论(0)

heti94575 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档