ppt课件-construction methods- s u n y i t homepage(施工方法u n y我t主页).ppt

* * * * * * * * * * * * * * * * * Spoil Banks Spoil bank Vol = X sect area x length B = (4V/(lx tan R))^1.2 H = (B x tan R)/2 B – base width H height L length R angle of repose V volume Spoil Banks Spoil pile Vol = 1/3 p(D/2)^2 X H D = (7.64V/tan R)^1/3 H = D/2 x tan R D – diameter of base H height R angle of repose V volume How long would a spoil bank for 40000 cy be if it was 100’ wide? Angle of repose = 30 deg How high can a spoil pile 50’ in diameter be if the angle of repose = 35 deg? How many cy can it hold? Estimating earthwork 3 types of excavations Small pit Trench Large areas Road