南非竖井施工建设

Sinking Methodologies Anlaysis Content Sinking methodology Pre-sink to 30 m Pre-sink to 90m Slow Sink to 165m Main Sink to final depth Sinking Analysis Cycle Times Advance per blast Continuous Improvement Typical Phases of Shaft Sinking Phase 1 – Box Cut with Collar Construction – 10 to 15 m below collar Phase 2 – Pre-sink to -30m to allow installation of pre-sink equipment Phase 3 – Pre-sink to -90m to allow for installation of main sink equipment Phase 4 – Slow Sink to -165m Phase 5 – Main Sink to Final depth Phase 6 - Equipping * Technical - Method Statement Location Phase