天台县三合镇塘里山塘综合整治工程施工组织实践毕业论文.doc

天台县三合镇塘里山塘综合整治工程施工组织实践毕业论文.doc

  1. 1、本文档共38页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
天台县三合镇塘里山塘综合整治工程施工组织实践毕业论文

毕业实践(论文) 题 目:天台县三合镇塘里山塘综合整治工程施工组织设计 系 (部): 水利水电建筑工程 专业班级: xxxxxxxxxxxx 姓 名: xxx 学 号: xxxxxx 指导教师: xxxx 水利与环境工程学 院 2014年5月26日 摘 要 Abstract The graduate internship program is Sanhe Town Tiantai pond ponds comprehensive renovation project, the project combines the internship graduation thesis is Sanhe Town Tiantai comprehensive treatment ponds and pond construction organization design. Pond ponds located below the village of Sanhe Town Tiantai County , is a mountain -based irrigation ( 2 ) type ponds . Ponds and dam catchment area 0.156k meters, mainstream length 0.496km, total capacity of 33,800 m3. Crest length 67.3m, crest elevation of 99.31-99.80m, crest width of 3.40-7.80m, the maximum height of 10.0m, the presence of the left side of the dam seepage , hoist equipment damage , no hoist room . Positive spillway spillway . Pond ponds built in 1960, 50 years, as irrigation water and villagers living below the village water sources , played a significant engineering benefits. However, due to restrictions by the conditions prevailing design standards low , poor quality of construction , after many years of operation , there are many security risks currently ponds . According to Sanhe Town Tiantai pond ponds and comprehensive treatment project design specifications and construction drawings , ponds by regulation after unification crest elevation of 99.50m, crest width of 5.0m, the upstream slope 1:2.0 , using C25 concrete precast block revetment downstream slope of 1:1.75 , using C20 concrete sash turf slope , widening the spillway bottom width to 5.0m, update hoisting equipment . The project includes the dam, spillway and water systems engineering. Keywords: ponds comprehensive improvement; crest; spillway; construction design 目 录 摘 要 I Abstract II 目 录 III 1 工程概述及施工总体部署 1 1.1 工程概 1 1.2 施工平面总布置 2 1.3 施工总体安排 3 2主要项目施工方法 7 2.1 土方开挖 7 2.2 土方填筑 8 2.3 粘土斜

您可能关注的文档

文档评论(0)

luyanyan + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档