- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
DifIEC61215第三版本差异分析概要
Department name TüV SüD Group TüV SüD Group Department name Difference between IEC 61215 ed2 and ed3 draft TüV SüD PHOTOVOLTAICS Xiangxi Bo 2011-08-27 Tel : +86/ (0) 512 6809 5318 - 105 Fax: +86/ (0) 512 6809 5328 Mail: David.bo@ IEC PV Certification Department name * IEC ISO ITU Standard Management Board Conformity Assessment Board IECEE TC82 Central Office Other TC IECQ IECEx CTL ETF-9 NCB CBTL WG2 flat panel WG3 System WG6 BOS WG7 CPV PV * Overview 3rd edition includes the following significant technical changes with respect to the 2nd edition: Maximum power at STC has been made a pass/fail criteria. b) Added retest guidelines. c) Completely changed the hot spot test. d) Update the other tests to be consistent with changes in IEC 61646. e) Removed the method for measuring temperature coefficients and refer to IEC 60891. f) Combined the NOCT test with the Outdoor exposure test and renamed the resultant temperature as NMOT. PV * IEC 61215 2nd v.s. IEC 61215 3rd Item Chapter/Clause Details 1 4 Marking Added: nominal and minimum values of maximum output power at STC after preconditioning, as specified by the manufacturer for the product type (Section 5) 2 5 Testing Modified: preconditioning changed from 5-5.5 kWh x m-2 to 5-20 kWh x m-2, After this preconditioning all of the test modules shall be measured for STC power. (10.2) 3 5 Testing Added: 10.4, 10.5, 10.6 and 10.7 may be omitted at the discretion of the customer Department name * 4 5 Testing Add: The order of tests in the “electrical and thermal performance sequence” is not important although tests 10.4, 10.5 and 10.6 must be performed before the subsequent stress tests 10.8, 10.18 and 10.9. If desired separate modules may be utilized for 10.8, 10.18 and 10.9. 5 6 Pass criteria Added: The STC power measured in 10.2 shall meet the manufacturer’s power rating range after preconditioning. Note: The pass/fail criteria must consider the laboratory uncertainty of the measurement. As an example if
您可能关注的文档
最近下载
- 中国古代体育的发展和演变.ppt VIP
- 广西北海海事法院招聘聘用制书记员考试试题及答案.docx VIP
- 体育史 全套课件.PPT VIP
- 体育史 课件完整版.pptx VIP
- BS EN 12390-4-2019 Testing hardened concrete Part 4:Compressive strength – Specification for testing machines 硬化混凝土试验第4部分: 抗压强度试验机规范.pdf
- BS EN 12350-5-2019 新鲜混凝土试验.第5部分:流动表试验.pdf VIP
- BS EN 12350-4-2019 新鲜混凝土试验.第4部分:密实度.pdf VIP
- BS EN 12350-5-2019 Testing fresh concrete Part 5:Flow table test 新拌混凝土试验第5部分: 流动台试验.pdf
- 颈动脉支架成形术治疗颈动脉狭窄病人的护理.pdf VIP
- 重庆文理学院,校考,中国现当代作家作品选复习题1.doc VIP
原创力文档


文档评论(0)