integratedsafeguardsdatasheet(isds).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
integratedsafeguardsdatasheet(isds)

Integrated Safeguards Data Sheet (ISDS) Section I – Basic Information Date ISDS Prepared/Updated: August 9, 2004 Report No.:AC978 A. Basic Project Data A.1. Project Statistics Country: Iran, Islamic Republic of Project ID: P088060 Project: BAM EARTHQUAKE EMERGENCY RECONSTRUCTION TTL: Sateh Chafic El-Arnaout Total project cost (by component): US$ 235 million Appraisal Date: June 14, 2004 Loan/Credit amount($m): IBRD: 220 Board Date: October 28, 2004 Other financing amounts by source: N/A Managing Unit: MNSIF Sector: Housing Construction (80%), Roads and highways (14%), Telecommunications (6%) Lending Instruments: Emergency Recovery Loan Is this project processed under OP 8.50 (Emergency recovery?) Yes? [X] No? [ ] Environmental Category: B A.2. Project Objectives The objectives of the Bam Earthquake Emergency Reconstruction Project (BEERP) are to: (a) restore the living conditions of the communities affected by the earthquake; (b) improve emergency preparedness in the Province of Kerman and the city of Bam and; (c) strengthen the planning and management capacity under the reconstruction program. A.3. Project Description The project objectives will be met through the five components described below: Component-A- Provision of Construction Material and Equipment for Housing and Commercial Buildings: This component will finance the procurement of: (i) construction material (steel bars, steel components for frames and Portland cement) for housing and commercial buildings; (ii) construction equipment and; (iii) design and supervision activities. Component-B- Repair of the Transport Infrastructure: This component will finance: (i) the rehabilitation and preventive works for the main highway linking Bam with the provincial capital city of Kerman; (ii) the rehabilitation and reconstruction of the Bam Airport facilities; (iii) the rehabilitation and paving of village streets and; (iv) d

文档评论(0)

jvdodnnv002 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档