- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
毕 业 设 计(论文)
外 文 文 献 翻 译
文献、资料中文题目:国际建设工程风险分析
文献、资料英文题目:
文献、资料来源:
文献、资料发表(出版)日期:
院 (部):
专 业:
班 级:
姓 名:
学 号:
指导教师:
翻译日期: 2017.02.14
外文文献:
This analysis used a case study methodology to analyze the issues surrounding the partial collapse of the roof of a building housing the headquarters of the Standards Association of Zimbabwe (SAZ). In particular, it examined the prior roles played by the team of construction professionals. The analysis revealed that the SAZ’s traditional construction project was generally characterized by high risk. There was a clear indication of the failure of a contractor and architects in preventing and/or mitigating potential construction problems as alleged by the plaintiff. It was reasonable to conclude that between them the defects should have been detected earlier and rectified in good time before the partial roof failure. It appeared justified for the plaintiff to have brought a negligence claim against both the contractor and the architects. The risk analysis facilitated, through its multi-dimensional approach to a critical examination of a construction problem, the identification of an effective risk management strategy for future construction prject and risk
The structural design of the reinforced concrete elements was done by consulting engineers Knight Piesold (KP). Quantity surveying services were provided by Hawkins, Leshnick Bath (HLB). The contract was awarded to Central African Building Corporation (CABCO) who was also responsible for the provision of a specialist roof structure using patented “gang nail” roof trusses. The building construction proceeded to completion and was handed over to the owners on Sept. 12, 1991. The SAZ took effective occupation of the headquarters building without a certificate of occupation. Also, the defects liability period was only three months .
The roof structure was in place 10 years At first the SAZ decided to go to arbitration, but this failed to yiel
您可能关注的文档
- 3r原则对的工业设计的影响大学毕业论文英文文献翻译及原文.doc
- ABSTRACT风力发电大学毕业论文英文文献翻译.doc
- digital-filter-design数字滤波器设计大学毕业论文英文文献翻译及原文.doc
- Intelligent-parking-system智能停车场系统大学毕业论文英文文献翻译及原文.doc
- InventoryManagement存货管理大学毕业论文英文文献翻译及原文.doc
- Manipulator机械手大学毕业论文英文文献翻译及原文.doc
- MineSafety煤矿安全大学毕业论文英文文献翻译及原文.doc
- New-Competencies-for-HR人力资源管理的新型胜任力大学毕业论文英文文献翻译及原文.doc
- Oracle虚拟机服务器软件虚拟化在一个64位Linux环境的性能和可扩展性大学毕业论文英文文献翻译及原文.doc
- Risk-Management风险管理大学毕业论文英文文献翻译及原文.doc
- 国际经济与贸易专业国际服务贸易与经济增长的理论与实证研究大学毕业论文英文文献翻译及原文.doc
- 互利共赢的供应商质量控制)大学毕业论文英文文献翻译及原文.doc
- 会计帐户应收账款(AR)大学毕业论文英文文献翻译.doc
- 会计专业外文企业的社会责任大学毕业论文英文文献翻译及原文.doc
- 会计专业信息失真大学毕业论文英文文献翻译及原文.doc
- 机械制造及其自动化专业模具的发展大学毕业论文英文文献翻译及原文.doc
- 基于DS18B20的单片机温度测量系统大学毕业论文英文文献翻译.doc
- 基于单片机的交通灯设计大学毕业论文英文文献翻译及原文.doc
- 基于知识工程(KBE)设计方法大学毕业论文英文文献翻译及原文.doc
- 计算机科学与技术History-of-computing历史的计算学毕业论文英文文献翻译及原文.doc
最近下载
- 《懂得爱:在亲密关系中成长》读书笔记.docx VIP
- 上海市中考语文专题复习:文言文虚词简表.pdf VIP
- 广西盐业公司的招聘试卷.pdf VIP
- 2025《民营经济促进法》解读课件PPT.pptx
- Haier海尔空调KFRd-120LW 7YAF81 KFRd-120LW 5YAF82 KFR-12ity 5YAF82用户手册.pdf
- 雪铁龙维修 手册 图DS_5LS_Owner_Book_ZH.pdf VIP
- 烟风煤支吊架设计手册-新版.pdf VIP
- 长期卧床鼻饲患者的护理ppt.pptx VIP
- 教学能力大赛教案--智慧工厂的安全策略之VLAN的划分.docx VIP
- GB 6246-2011 消防水带标准规范‘’.pdf
文档评论(0)