- 1、本文档共22页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
StreamflowandRunoffThecharacteramountandtimingo
* * Streamflow and Runoff The character, amount, and timing of discharge from a basin tells a lot about flow paths within the basin Therefore, important to hydrogeologist to identify how to create stream hydrographs from discharge measurements Measurement of discharge: Method used depends on type of study, size of river and flow, data requirements, etc. For small scale field studies discharge is measured over a cross-section at the point of interest using: a) float method - time surface float from point a to point b - average velocity is 0.85*surface velocity - mean velocity*x-sectional area = discharge - measurement distance should be ~10x stream width - very rough estimate b) stream gage - average velocity in a stream occurs at 0.368*depth above the bottom - therefore standard to measure along a cross-section at 0.4 depth off bottom - for more accurate estimates, averaging and depth measurements can be made.. c) dye dilution - good method for turbulent streams - need to use tracer that is a) easily soluble, b) have no or very low natural concentrations in stream, c) be conservative, d) easily detectable at low concentrations, e) ecofriendly, f) affordable - sodium chloride (NaCl) often used, and concentration/conductivity relation established - by introducing tracer upstream and measuring rate of concentration change downstream we can calculate discharge for the stream reach for a gulp injection where CT is the initial tracer concentration being introduced Cb is the background concentration in the stream and the integral in the denominator is evaluated graphically from a C vs. t plot.. d) direct measurement - can be used in small streams where it is possible to focus all flow into a collector More “Permanent” installations can be made using: a) - Dam (plate) with a v-notch (typically) that allows for controlled discharge through the notch. - discharge can be related to the height of the back-water - problems with sedimentation Rect
您可能关注的文档
- ProeNC数控加工.ppt
- Proe装配设计.ppt
- proe必掌握装配知识.ppt
- ProeNC数控加工2.ppt
- proe特征复制完全.ppt
- ProgressandplansforPPMintheSouthEastAsiaRegion.ppt
- ProjectManagement.ppt
- ProgrammingMultiCoreSystems.ppt
- ProjectProposalHMM小组.ppt
- ProjectprogressStudyontheEstablishmentofChinaGr.ppt
- 2021年初级银行从业资格考试《个人理财》能力测试试题 附解析.pdf
- 2022-2023学年沪教版初中化学九年级上册期末必刷常考题 .pdf
- 2023-2024学年九年级数学上册《第二十四章 圆》单元测试卷有答案(人教.pdf
- 2021年中级银行从业资格考试《个人贷款》真题及答案 .pdf
- 2020年每日检修工作日志范文建筑实习日志范文40篇 .pdf
- 2022中级银行从业资格证《银行管理》每周一练试卷 .pdf
- 2022-2023学年湖南省汉寿县数学八上期末统考模拟试题含解析 .pdf
- 2022年最新粤沪版八年级物理下册第十章从粒子到宇宙综合测试试题(含答 .pdf
- 2024年大健康项目立项申请报告模版 .pdf
- 2021年移动L1认证考试代维集客题库 .pdf
文档评论(0)