混合工质变浓度热泵系统的研究-Nikhef.ppt

  1. 1、本文档共31页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
混合工质变浓度热泵系统的研究-Nikhef

Table of Contents CO2 cooling and the 2PACL method LHCb-VELO Thermal Control System (VTCS). Commisioning results of the VTCS. Conclusions. Why Evaporative CO2 Cooling? Property comparison 2 evaporative cooling principles used in LHC detectors The 2-Phase Accumulator Controlled Loop (2PACL) 2PACL principle ideal for detector cooling: Liquid overflow = no mass flow control Low vapor quality = good heat transfer No local evaporator control, evaporator is passive in detector Very stable evaporator temperature control at a distance (P4-5 = P7) LHCb Detector Overview The LHCb-VELO Detector (VErtex Locator) The Velo Detector VELO Cooling Challenges VELO electronics must be cooled in vacuum. Good conductive connection Absolute leakfree Maximum power of the electronics: 1.6 kW Silicon sensors must stay below -7°C at all times (on or off). Adjustable temperature for commisioning. -5°C to -30°C (Nominal irradiated -25°C) Maintenance free in inaccessable detector area VTCS Evaporator Concentric transfer line VTCS Schematics 2x CO2 2PACL’s connected to 2 R507A chillers (Redundancy) Lots of sensors and valves VTCS construction CO2 2PACL’s Stainless steel piping with: (Orbital) Welding Vacuum Brazing Swagelok Cajon VCR fittings and line components Lewa liquid CO2 pump (100 bar) In house designed accumulator (130 bar) Reinforced SWEP condenser (130 bar) Now commercial available at SWEP. 55 meter concentric transfer line Aluminium casted cooling blocks Chillers designed in house with standard commercial chiller components. Copper piping with hard solder joints Danfoss line components Bitzer compressors SWEP heat exchangers Siemens S7-400 series Programmable Logic Controller (PLC) VTCS 2PACL Operation From start-up to cold operation (1) VTCS 2PACL Operation From start-up to cold operation (2) March ’08: Commisioning of the VTCS Detector under vacuum and unpowered 24 June ’08: After a succesful commisioning of the detector at -25°C, the setpoint is incr

文档评论(0)

busuanzi + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档