- 1、本文档共161页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
立井井筒施工组织设计方案
摘要
梁宝寺二号井由肥城矿业集团公司投资兴建,矿址位于山东省嘉祥县,东南距嘉祥县城约20km。LiangBao temple no.2 shaft mining group company of feicheng invested in shandong province, ore addresses from jiaxiang county rizhao-heze expressway, southeast 20km about. Coal mine by international engineering group nanjing design institute design, production capacity of 12,000 Mt/a, Using vertical industrial field, the layout, and three vertical wind.
This design includes three parts: the first part is the basic situation of the construction of coal mining area, including the general situation and the geological exploration and mining, coal mine, the main production systems, industrial square arrangement and ground building, mine construction main technical and economic indexes.
The second part is LiangBao temple no.2 shaft construction organization tram wellbore bedrock, including the building construction preparation: well prepared, engineering technology, supplies and construction work to prepare, foreign cooperation, the surface of the vertical the construction organization design: freeze design (freeze depth, the determination of frozen wall surface), construction, tunneling, vertical section of the bedrock, the construction organization design: vertical bedrock section of the construction scheme, vertical bedrock tunneling (drill-blasting method using construction, including drilling and blasting equipment eye the selection of materials, the blasting parameters and blasting chart, to grasp the rock bolting, made with circular diagram and labor organization), and suspension, suspension system, the arrangement and changeless changeless flat beam structure and checking, hoist and steady vehicles arrangement, construction, auxiliary system safety technical measures, etc.
The third part is the special parts: LiangBao temple no.2 shaft gets grouting technique of main shaft ground, including Wellbore survey controlling,Gets the grouting.
Keywords: field exploit shaft construction drill blasting grouting eyes water.
您可能关注的文档
- 2016年范各庄煤矿180wt初步设计书.doc
- 2016年黑龙江省粮食物流关键问题研究.doc
- 2016年克拉玛依油田小修(检泵)技术.doc
- 九江金彭贸易公司厂房建设项目可行性研究报告(可行性研究报告).doc
- 九江紫庐花园建设工程项目可行性研究报告书.doc
- 酒埠风景区环境评估报告.doc
- 酒厂搬迁环境情况评估报告表.doc
- 酒店南区室内led灯改造工程项目可行性研究论证报告.doc
- 酒店水体生态修复工程项目可行性研究论证报告.doc
- 酒钢4#焦炉、与3#4#焦炉相配套的干熄焦装置及备煤、化产系统改造工程初步设计劳动安全篇.doc
- 第12课 大一统王朝的巩固 课件(20张ppt).pptx
- 第17课 君主立宪制的英国 课件.pptx
- 第6课 戊戌变法 课件(22张ppt).pptx
- 第三章 物态变化 第2节_熔化和凝固_课件 (共46张ppt) 人教版(2024) 八年级上册.pptx
- 第三章 物态变化 第5节_跨学科实践:探索厨房中的物态变化问题_课件 (共28张ppt) 人教版(2024) 八年级上册.pptx
- 2025年山东省中考英语一轮复习外研版九年级上册.教材核心考点精讲精练(61页,含答案).docx
- 2025年山东省中考英语一轮复习(鲁教版)教材核心讲练六年级上册(24页,含答案).docx
- 第12课近代战争与西方文化的扩张 课件(共48张ppt)1.pptx
- 第11课 西汉建立和“文景之治” 课件(共17张ppt)1.pptx
- 唱歌 跳绳课件(共15张ppt内嵌音频)人音版(简谱)(2024)音乐一年级上册第三单元 快乐的一天1.pptx
文档评论(0)