Preliminary Dispersion Modeling for the NuStart Plant at初步的离散建模的nustart厂.pptVIP

Preliminary Dispersion Modeling for the NuStart Plant at初步的离散建模的nustart厂.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Preliminary Dispersion Modeling for the NuStart Plant at初步的离散建模的nustart厂

11th NUMUG Meeting - St. Louis 10/13/06 Preliminary Dispersion Modeling for the NuStart Plant at Bellefonte Doyle E. Pittman and Kenneth G. Wastrack Tennessee Valley Authority Introduction Construction at Bellefonte halted in 1988 Two units placed in deferred status Site selected in 2005 by NuStart for new plant Old construction permit cancelled in 2006 New plant: Passive-reactor design - Westinghouse AP1000 Conceptual Layout at Bellefonte Meteorological Data Collection Data collected onsite from 1972 to 1983 Temporary towers until 1978 Permanent 110 meter tower from 1975 Wind flow study in 1993 Tower removed Building left Training tower erected (55 meter) Terrain Cross Section Examination of Monitoring History Meteorological measurements at the local site reasonably represent conditions at surrounding locations and short-term measurements are representative of longer-term periods. The last complete year of data collected at the permanent meteorological monitoring facility is more than 20 years old so it will not be acceptable as “the most recent 1-year period”. Exam Continued Historical data were archived and are retrievable. Meteorological data collected in the valley do not adequately represent meteorological conditions in the Bellefonte vicinity (10-mile EPZ) for emergency preparedness applications. Data Collection Renewed Evaluated 55 meter tower – acceptable Evaluated data needed for COLA submittal Used guidance from ANS-3.11 (2005) Installation begun in January 2006 Operation began in April 2006 Bellefonte Meteorological Tower Site Acceptability Evaluation Westinghouse AP1000 Design Control Tier 1 Document identifies key site parameter specifications related to the design of safety-related aspects of structures, systems, and components for the AP1000. An actual site is deemed acceptable if its site characteristics fall within these plant site design parameters. Evaluation Continued Parameters include Atmospheric Dispersion Factors (χ/Q) for:

您可能关注的文档

文档评论(0)

118books + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档