- 25
- 0
- 约1.2万字
- 约 50页
- 2017-03-09 发布于上海
- 举报
USPEP Purified Water and Water for Injection Systems uspep纯化水和注射用水系统
Validation Criteria IQ Information Limits on material? The more information available, the better. If a accessory breaks, it must be replaced. The model number, serial number, and/or manufacturer may change or no longer exists. “Cut sheets” of accessories provide an excellent vehicle for identifying a “like-for-like” replacement which significantly reduces the “Change Control” effort. Validation Criteria IQ Information All support information should reference the original manufacturer’s part number. Project specifications should clearly state that the name of the manufacturer as well as the part number be provided. The vast majority of this information is “coded” to the water purification equipment manufacturer’s model number, useless for replacement on a “like-for-like” basis. Validation Criteria OQ Information Prepared and executed in an integrated basis. Individual Unit Operation will impact the operation of other components. Execution must provide exact operating condition. As an example, if media is not installed in a pretreatment component during execution of a FAT, execution (partial) may be required after installation and start-up. Validation Criteria OQ Information – Considerations Fixed alarm and operating set points versus adjustable set points Processor access levels Alarm set points and time delays Control set points and time delays View screen navigation “ALERM” banner display “OPERATOR OVERRIDE” banner display Validation Criteria PQ Criteria Post start-up and commissioning 30 day sample period Sampling plan to duplicate water use “Working days” Attempt to duplicate water demand Attempt to duplicate actual conditions at individual points-of-use Validation Criteria PQ Criteria Every point-of-use every day if practical TOC “grab” samples from each points-of-use Conductivity “grab” samples from points-of-use Suggest transition for about 30-60 days after successful execution Continues for one year period Monitoring never stops Validation Crite
您可能关注的文档
- Universal Turing Machines cs通用图图.virginia.ppt
- Universally Composable Security A new paradigm for通用可组合安全的新范式.ppt
- UNIVERSAL PRECAUTION Akademik Ciamik 2010通用的预防措施的ciamik 2010.ppt
- Univers Social 216214大学的社会216214.wikispaces.ppt
- UNIVERSIDAD Y RESPONSABILIDAD SOCIAL大学与社会责任.ppt
- Universit d’t 2010 Diversit culturelle et progrs humain大学233临床与233T & 2332010年表面与233文化和程序与232S的人.ppt
- Universities, Industry and Government大学、工业和政府.ppt
- UNIVERSITA’ DEGLI STUDI DI SIENA Scuola di 锡耶纳大学研究学院.ppt
- Universita’ degli Studi di Pavia Facolta di Lettere e 帕维亚大学研究院人文与.ppt
- Universidade Federal de Engenharia de Itajub 联邦大学的工程和itajub 225.ppt
- 广东省广州省实验中学教育集团2025-2026学年八年级上学期期中考试物理试题(解析版).docx
- 广东省广州大学附属中学2025-2026学年八年级上学期奥班期中物理试题(解析版).docx
- 广东省广州市第八十六中学2025-2026学年八年级上学期期中物理试题(含答案).docx
- 广东省广州市第八十九中学2025-2026学年八年级上学期期中考试物理试题(解析版).docx
- 广东省广州市第二中学2025-2026学年八年级上学期期中考试物理试题(含答案).docx
- 广东省广州市第八十六中学2025-2026学年八年级上学期期中物理试题(解析版).docx
- 广东省广州市第八十九中学2025-2026学年八年级上学期期中考试物理试题(含答案).docx
- 广东省广州市第二中学2025-2026学年八年级上学期期中考试物理试题(解析版).docx
- 2026《中国人寿上海分公司营销员培训体系优化研究》18000字.docx
- 《生物探究性实验教学》中小学教师资格模拟试题.docx
原创力文档

文档评论(0)