Tappet clearance of inlet valve and outlet valve inspected and measured .
17:50voyage 9507commenced
Injection pumps adjusted to make each cylinder even indicator power .
Ignition checked with indicator card
8:30a.m arrived at Kobe port ,fuel oil changed into diesel oil ,and low sea water chest changed into high sea water chest .8:45piolet came on board and maneuvering started ,Finish with engine at 9:30a. m
12:30alarm of shaft generator started due to heavy sea ,NO. 1generator stated for use and the pitch of variable pitch propeller reduced from 9.5to 9.0.
4:30a. m the main engine turned by