- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
mp1mlchl22192004
MP1/MLC/hl2 2/19/2004
BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA
Order Instituting Rulemaking on policies and practices for advanced metering, demand response, and dynamic pricing.
Rulemaking 02-06-001
(Filed June 6, 2002)
JOINT ASSIGNED COMMISSIONER AND
ADMINISTRATIVE LAW JUDGE’S RULING
PROVIDING GUIDANCE FOR THE ADVANCED METERING
INFRASTRUCTURE BUSINESS CASE ANALYSIS
Summary
This ruling provides policy direction regarding the minimum level of system functionality that should be supported by an advanced metering infrastructure (AMI) for purposes of analyzing full-scale AMI deployment. The ruling also addresses which customer classes should be included in the AMI analysis, clarifies the costs to be included in the base case AMI analysis, directs the Working Group 3 (WG3) moderator to schedule a workshop to review sources of avoided costs for valuing peak demand reductions, seeks input on the need for a workshop on methodologies for estimating demand response, and clarifies the meaning of “out of scope” impacts.
Background
The purpose of this proceeding is to increase the level of demand response, in particular price responsive demand, “as a resource to enhance electric system reliability, reduce power purchase and individual consumer costs, and protect the environment.” California’s energy agencies have already provided some guidance on the types of rates and technologies to be supported by the AMI system in the vision statement appended to Decision 03-06-032 as Attachment A. The rate options and technology functionalities outlined in the vision statement can be utilized as the framework for the AMI system functionality and business case analysis.
Guidance on AMI System Functionality
Agency staff from the California Energy Commission (CEC) and this Commission report that participants at the January 28, 2004 AMI workshop requested additional direction on the types of rate structures the AMI system should support and more sp
您可能关注的文档
- module26learningoutsidetheclassroom.doc
- module27communityproblemsolving.doc
- moduletitleanalysisofquantitativedata–i.doc
- module24appropriateassessment.doc
- molecularcloning,sequencecharacterization,polymorphism.doc
- moneyandbanking2009i.doc
- monitoringandmodellingopensavannasusingmultisource.doc
- monitoringinspectionsofschoolsthathaveseriousweak.doc
- monosodiumglutamate.doc
- monthlyairfareanalysis.doc
- mpsserialcommunicationlabexercise.doc
- mrs.shawneenbixler.doc
- ms.secopitopleasewelcomemr.carlolaserna.doc
- mtfsmartmetaltubevariableareaflowtransmitter.doc
- mullard20wtubeamplifier.doc
- multi-agentsysteminaiofcomputergames.doc
- multilateralmonitoringoffoodsafetylaw.doc
- multimediacenter.doc
- multimediadesignanddevelopment.doc
- multiplelinearregressiontheequivalenceofleastsquares.doc
最近下载
- 城市道路交叉口设计规程 152-2010正式版.ppt VIP
- 新版道德与法治三年级上册《4.科技力量大》教学设计.docx VIP
- baumer产品手册tds exg50exg50技术数据数字单色黑白相机系统千兆位以太网堡盟.pdf VIP
- 空气压缩机单机试车方案改.doc VIP
- GBT 19002: 2018X 质量管理体系 GBT 19001—2016应用指南( 征求意见稿 ).pdf VIP
- 电子商务专业高等学校特色专业建设任务书终稿.doc VIP
- 通过对物理实验数据的分析培养学生的数据处理能力.pptx VIP
- 重庆土特产包装包装最后结案.doc VIP
- 惠而浦滚筒洗衣机增高储物底座安装维修作业指导.pptx
- 2022年07月【九年一贯制+幼儿园】深圳金地新沙福荣学校建筑方案文本.pdf VIP
文档评论(0)