- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
projectexecutionplan
PROJECT EXECUTION PLAN
CP?? / ???
Project Name
Estates Buildings
University of Glasgow
January 2003
Contents
Project Details
Scope of The Project
Cost Plan
Programme of Works
Commissioning Details ( Design Team and Contractor )
Commissioning Details ( University Management Team )
Project Control Procedures
Contracting Strategy
Risks / Problems
Reporting arrangements
Completion and Handover
Final Account
Project Cost Analysis
Contract Evaluation report
Consultant Evaluation reports Architect
Quantity Surveyor
Mechanical and Electrical Engineer
Structural Engineer
Planning Supervisor
Project Evaluation Report
Appendices
Project Details
Project Details Project
Project Controller
Project Managers
Estates and Buildings
Design Team Architect
Quantity Surveyor
M E Engineer
Structural Engineer
Planning Supervisor
Contract Details Principal Contractor
Contract Type To be Confirmed
Contract Sum To be Confirmed
Contract Period To be Confirmed
Practical Completion To be Confirmed
Funding Details New Build £ …………………… Refurbishment £ Fees (Professional Stat.) £ VAT £ Total £
Scope of the Project
Background This section to be written by Project Officer
Scope of the Project This section to be written by Project Officer
Aims of the Project This section to be written by Project Officer
Project
Set-up Form
As part of the Office procedures for Capital Projects a Project Set-up Form is drafted at this stage by the Project Manager in order to open the relevant filing system for the project.
Cost Plan
Funding Details The total funding is as follows:
TOTAL : Finan
您可能关注的文档
- productionofcommerciallysuitable.doc
- productionplanningandscheduling(pps)version1.0.doc
- productiontaxcreditforrefinedcoal.doc
- productlinemanagersstatusreport–february2007.doc
- productreleasenotesforavayaproactivecontact4.1.1.doc
- prof.deepankarchoudhury,ph.d.,figs,fiset,.doc
- prof.dr.sci.svetlozar(zari)rachev–curriculumvitae.doc
- prof.stanislavpejovic,ph.d.,p.eng.doc
- professionalpaper.doc
- professorhelenvalerieatkinson,ba,ma,phd,drhc,freng.doc
文档评论(0)